Laserfiche WebLink
<br />RECLAMATION COST ESTIMATE <br />This cost estimate is based on the following assumptions: <br />• 10 acres of stripped area prior to mining <br />10 acres of active mining area (average 10' depth) <br />• 10 acres ofbackfilled area <br /> <br />TASK UNIT QUANTITY PRICE TOTAL <br />Backfilling (l0 ac.) 161,333 cy $1.00 $161,333.00 <br />haul of up to 2000' <br />2. Topsoiling Disturbed Areas (30 ac.) <br />push of up to 500' <br />avg. depth of 6" to 9" <br />3. Scarify Prior to Seeding <br />29,040 cy $1.00 $29,040.00 <br />30 acres $100.00 $3000.00 <br />4. Seed and Mulch <br />SUMMARY OF RECLAMATION COSTS <br />Description Item Cost <br />Disturbance Cost Total $217,373.00 <br />Contractor MOB/DEMOB (8%) $ 17,390.00 <br />Overhead (18.5%) $ 43,431.00 <br />Administrative (5.0%) $ ]3,910.00 <br />Total Proposed Bond $292,104.00 <br />Disturbance Acreage 30 acres <br />Bond Cost per Acre $ 9736.80 <br />30 acres $800.00 $24,000.00 <br />TOTAL $217,373.00 <br />