My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-11-07_REVISION - M1984041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984041
>
2003-11-07_REVISION - M1984041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:42:30 PM
Creation date
11/21/2007 8:56:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984041
IBM Index Class Name
Revision
Doc Date
11/7/2003
Doc Name
Plans & Specifications for Erosion Control Dams
From
Knight Piesold Consulting
To
DMG
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.: ~ •J <br />Knight Piesold <br />e ons u~rlna <br />• In subsection 603.02, delete all materials except Corrugates Steel Pipe and Pipe <br />Arches. <br />• In subsection 603.03, General, delete paragraphs 2 and 3 regarding sanitary sewers. <br />• In subsection 603.04, Excavation, delete paragraphs 5 regarding pipe jacking. <br />- The title of subsection 603.05, "Bedding for Concrete or Clay Pipe", shall be <br />amended to be "Bedding". <br />• In subsection 603.07, delete items (a) and (c) regarding concrete, clay and plastic <br />pipe. <br />• Delete subsection 603.08, Elongation. <br />• In subsection 603.08, Backfilling, add the words "by the Engineer or Owner" after the <br />word "inspected" in the first pazagraph. <br />• In subsection 603.08, Backfilling, delete paragraph 2 and add the following <br />pazagraph: <br />- "Special care shall be taken to backfill around the cutoff collars for the sediment <br />ponds. The intent of the cutoff collar is to prevent seepage flow along the sediment <br />pond outlet pipes. Voids within the soil around the collar will reverse this intent. <br />Hand placement and compaction of the material around the cutoff collazs may be <br />required, at the discretion of the engineer or Owner. <br />• In subsection 603.12, Basis of Payment, delete all items for payment except <br />Corrugated Steel Pipe. <br />2.5.2 Section 625 -Construction Surveying <br />Section 625 of the Standard Specifications is hereby revised for this project as follows: <br />`Replace Subsection 635.04, Contractor Surveying, with the following: <br />- 625.04 Owner Surveying. The Owner shall perform all construction surveying and <br />stakeing that is necessary to complete the project. Construction surveying and <br />staking shall be based on survey control established by theEngineer or Owner. <br />Control Monuments or Right of Way monuments and all other monuments and <br />points that are required by law or regulation to be established and recorded by a <br />P.L.S. shall be reset in accordance with Section 629. <br />G:bmjeCI5WN101`OOtOlwplatcess raaE spea.0op 4 February 11, 200] <br />
The URL can be used to link to this page
Your browser does not support the video tag.