My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-11-07_REVISION - M1984041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984041
>
2003-11-07_REVISION - M1984041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:42:30 PM
Creation date
11/21/2007 8:56:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984041
IBM Index Class Name
Revision
Doc Date
11/7/2003
Doc Name
Plans & Specifications for Erosion Control Dams
From
Knight Piesold Consulting
To
DMG
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . _ .~ <br />Knight Piesold <br />eowau ~rlwo <br />2.0 Standard Special Provisions <br />This section includes revisions and/or additions to the Standard CDOT Sections 201 through 630 <br />that contain the Construction Details and Sections 701 through 713 that contain the Materials <br />Details. These revisions are based on Knight Piesold's review of the Standard Specifications <br />based on the scope of the Priority Basin 1 construction and comments received on the 65 percent <br />design technical specifications. <br />2.1 General <br />• This project will be constructed using English units. All measurements, tolerances, <br />and specifications will use English units. <br />• The word "Department" shall be replaced with "American Gypsum Company." <br />• The word "Engineer" shall be replaced with "Engineer or American Gypsum <br />Company Representative." <br />2.2 Secfion 200 -Earthwork <br />2.2.1 Section 201 -Clearing and Grubbing <br />No revisions to this section are made. <br />2.2.2 Section 203 -Excavation and Embankment <br />Section 203 of the Standard Specifications is hereby revised for this project as follows: <br />• In subsection 203.03, delete items (c) Muck Excavation, and (f), Potholing. <br />• In subsection 203.05, delete items (c) Muck Excavation, and (f), Potholing. <br />• ;Delete subsection 203.10, Blading. <br />• Delete subsection 203.11, Dozing. <br />• In subsection 203.12, delete items (d) Blading and Dozing, and (e), Potholing. <br />2.2.3 Section 206 -Excavation and Backfill for Structures <br />Section 206 of the Standard Specifications is hereby revised for this project as follows: <br />• In subsection 206.2, General, delete all except paragraph 1 and paragraph 1 of items <br />(a) and (b), references to flowfill and filter material. <br />• In subsection 206.2, General, add the following paragraph: <br />GlproledsbN101~D010\wpWCress matl spew.tloc 2 FeOrvary 11, 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.