Laserfiche WebLink
TO: Kathleen L. Sullivan, Environmental Protection Specialist <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />(1313 Sherman Sveet, Room 818 <br />Denver, Colorado aolo~pplemental Response to Reclamation Permit Application Consideration <br />Phone (303) 866-358 <br />FAX (303) 866-3589 <br />i www.watecstateso.us <br />`( DATE: August 1, 2005 <br />ML <br />'ff <br />c~SF <br /> <br />pF'COtp <br />'~~' 'By_ <br />ye <br />•~: <br />~ rBr6 ~ <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />CC: Division 5 Office; District 50 Water Commissioner <br />FROM: Cynthia L `L/ove, Water Resource Engineer ~~~ / <br />RE: Operator: Grand Gravel, Grand Gravel Pit, File No. M-1998-019, Revision No. CN-1 <br />Sections 1 & 12, Twp 1N, Rng 80W, 6th P.M., Grand County <br />Landowner- Marilyn L. and Richard E. Cttrrv <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclamation, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or other type <br />of well permit, as applicable, Prior to obtaining a permit, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document the <br />locafions of all wells within 600 feet mile of the pemilt area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit azea or contact this ofI-ice regazding the <br />600 foot spacing notification/hearing process. <br /> <br />The proposed operation may have potential uttpact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />The applicant has indicated plans to use other water for:_uses at the permit site, storage m the excavated <br />area(s). The applicant will need to provide evidence to this office that the water is permitted or decreed for such <br />uses. <br />Other: <br />COMMENTS: The applicant will use water from the Troublesome River for dust control at the permit site under free <br />river conditions. Water will be pumped from the river when it is not on call, and stored in large tanks for later use as <br />necessary. The applicant will be required [o curtail any undecreed diversions when a call is made on the river. The <br />applicant may wish [o apply for a water right with the Division 5 Water Court if this operation will continue for several <br />years. <br />