Laserfiche WebLink
<br />ExYiz.bi_t ' G' <br />M-77-170 <br />16 March 1998 <br />The overall pit operation will not affect surface or ground <br />water systems. Runoff from all disturbed areas will be and has <br />been contained within the affected land areas. <br />Land slopes / and gradients will be configured into slight <br />depressional / absorbtion areas. . <br />It is estimated that a maximum of 20,000 gallons of water <br />per day may be required for our concrete plant and dust <br />control. <br />The water requirement for the intermittent sand washing <br />operation amounts to approzimately 30,000 gallons per day of <br />which half is recycled. <br />The water requirement for the irrigation of reseeded slope <br />banks is expected to amount to 10 gallons per minute as <br />required. <br />