My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-04-02_REVISION - M1977170 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977170
>
1998-04-02_REVISION - M1977170 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 11:15:05 AM
Creation date
11/21/2007 8:48:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977170
IBM Index Class Name
Revision
Doc Date
4/2/1998
Doc Name
AMENDMENT APPLICATION BUTALA GRAVEL PIT M-77-170 AND YOUR LETTER OF 13 JANUARY 1998
From
BUTALA CONSTRUCTION CO
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/~ .. <br />• • <br />ExYlibit ' E' <br />Rec 1 amat z on P 1 ari <br />M-77-170 <br />14 March 1998 <br />The ultimate overall land/use plan for the affected land <br />areas upon the conculsion of mining is to provide for <br />construction company ,activity:, material storage, warehousing, <br />manu c uring an ea ~) <br />purposes that are consistent with the overall Industrial Zoning <br />~pp%~~ of this area. <br />4i During the months of May/June 1998 upon concluding mining <br />activities restoration / reclamation of sloped banks will <br />commence in the SH 1/4 of the SH 1/4 area of the original permit <br />area. <br />The 18,000 cubic yards of material located at the southerly <br />part of the Phase 3 mining area will be transported and <br />graded/blended into the final embankments as indicated in green. <br />The nearby stockpiled topsoil will be placed / graded onto these <br />final embankments. <br />Reseeding of these embankments will be in accordance with <br />the mizture and rate of application as specified by the Soil <br />Conservation Service. <br />The future continued reclamation of the Phased affected <br />land areas will occur relative to the numeric phases. <br />The sloped banks colored green will be graded / sloped at <br />a rate not be ezcede 2 to 1. Topsoil will be replaced and <br />reseeeded with the specified mizture. <br />Irrigation will be provided from the water pipe-line <br />adjoining the perimeter high bank of the reclaimed phases. <br />All top soil will be replaced at 4 to 5 inches in depth. <br />RECEIVED <br />APR 0 6 1998 <br />Division of Minerals & Georogy <br />
The URL can be used to link to this page
Your browser does not support the video tag.