My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-03-11_REVISION - M1977342 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2003-03-11_REVISION - M1977342 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:33 PM
Creation date
11/21/2007 8:45:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
3/11/2003
Doc Name
Forest Service Comments
From
Forest Service
To
DMG
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"reclamation plan," then it is appropriate to require that the land be returned to its pre-mining <br />condition, thus representing the natural state of the ecosystem and landscape for the William's <br />Fork area. <br />Section 2.4-Change in Reclamation Plan and Post-mining Land Use at the Tailings <br />Impoundment; Conceptual Alternative. This section of the amendment would eliminate the <br />present plan fora 100 percent dry cover, and replace it with a plan that would create a developed <br />water resource over approximately 70 percent of the impoundment, with the remaining 30 <br />percent continuing under the dry cover scenario. Given that the slopes in the area west of the <br />tailings impoundment include forested riparian areas, including some Hydric soils, we concur <br />that it will be the tendency of the site hydrology to have subsurface and surface flow, especially <br />where these riparian stringers enter the tailing impoundment area. The revegetation plan should <br />consider planting species that are appropriate to moister sites in these areas. However, based on <br />surrounding landforms, it is unlikely that open water wetlands were part of the natural system. <br />- Given the inherent-risks with-creating an open-water impoundment of this type_(discussed- -_ <br />below), it would seem advisable to retain the current plan for reclamation. <br />The tailings impoundment sits above the William's Fork River, mid-way down the drainage. <br />This scenario has potential implications for National Forest System lands below the <br />impoundment. It appears that a permanent water source would require that the tailings dam be <br />maintained perpetually, and the proposal provides no plan for such maintenance. All dams carry <br />with them the need for maintenance, and the inherent risk of failure. The longer a dam is in <br />place, the greater the risk of failure. If it were to fail, material and pollutants from the tailings <br />impoundment would be transported to the William's Fork River, thus causing catastrophic <br />damage to the aquatic ecosystem. Effects would not be limited to pollutant release, but would <br />also include the physical erosion and sedimentation effects created by a sudden release of a large <br />quantity of water. Additionally, in drought years such as we are now experiencing, limited <br />inflow of water could leave large areas of the impoundment bed diy, allowing pollutants to <br />become airborne, creating unknown down-wind health and environmental problems. <br />Based on the above discussion items, I respectfully request that the Division of Minerals and <br />Geology does not approve these sections of the amendment as requested by Climax. ff you have <br />any further questions about this response, please contact Patricia Hesch, Lands Staff, at (970) <br />887-4136. <br />Sincerely, <br />CRAIG'A. MAGWIIZ <br />District Ranger <br />cc: Grand County Board of County Commissioners, SO-Lands <br />
The URL can be used to link to this page
Your browser does not support the video tag.