Laserfiche WebLink
04016 <br />Banks and Gesso, LLC <br />EXHIBIT E -Reclamation Plan <br />Phase I: West Side Reclamation (Dam and Reservoir) <br />There is no change to the proposed reclamation plan for the reservoir area, <br />except that the seed mix for the reservoir banks has been modified as shown in <br />Table E-1, below. Please refer to the previous Amendment application, dated <br />June 3, 2003, for other aspects of the approved plan. <br />Phase II: East Side Reclamation (Pasture) <br />The additional areas included in this amendment application are all within the <br />Phase II area, and will not be mined. Reclamation for these new areas will be as <br />specified in the previously approved reclamation plan (see Amendment <br />application, dated June 3, 2003), except that the temporary and permanent seed <br />mixes are as specified in Tables E-1 and E-2, below. <br />Some of the roads used for hauling and processing material will remain as <br />access roads, and these are shown on Exhibit F. <br />DMG 112 Permit #M-77-534 Amendment June 10, 2004 <br />City of Golden -Empire Pit 7 <br />