Laserfiche WebLink
iii iiiiiiiiiiii iii <br /> - l�) I99 <br /> iii ) Ground and Surface Water Monitoring Plan: Results <br /> of ground and surface Water monitoring are incorporated in the <br /> ] yd 1 ogs.,:section of the permit application, pages 38 - 45ii , and <br /> in'annuE� hydrologic reports submitted to the Division. Monitor- <br /> ing schedules described in the Hydrology section were used to <br /> collect baseline data. The following is the current monitoring <br /> schedule. <br /> A. Ground Water <br /> 1 . Mine Inflows - The Blue Ribbon Mine was sealed in <br /> 1986 ; therefore , no further mine inflow studies or <br /> mine inflow maps will be prepared. <br /> 2 . Alluvial Well - The alluvial well was eliminated <br /> during reclamation work in 1986 ; therefore, no <br /> further monitoring of it will be done . <br /> 3. Springs - The spring at the base of the bench near <br /> the former pond 2 was collected in the south un- <br /> derdrain during the bench stabilization project <br /> during 1984 and 1985, so it Will be monitored with <br /> the underdrains. The spring near the south end of <br /> the disturbance boundary on the haul road <br /> - switchback never flowed enough water to measure so <br /> it will no longer be monitored. The flow in the <br /> draw north of the mine was monitored as a spring . <br /> Monitoring on this draw will be discontinued. <br /> 4 . Restabilized Bench Piezometers - Four piezometers , <br /> P-1 thru P-4 , were installed during the bench res- <br /> tabilization project in 1985. Two Piezometers , F- <br /> 5 & P-6 , were installed on the face of the bench <br /> late in 1989 . The piezometers will be monitored <br /> quarterly for water level . Results of monitoring <br /> will be submitted to the Division semiannually. <br /> 129 - (Rev . 14-90 ) <br />