My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-09-15_REVISION - M1981302 (10)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981302
>
1997-09-15_REVISION - M1981302 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 4:33:54 PM
Creation date
11/21/2007 8:43:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981302
IBM Index Class Name
Revision
Doc Date
9/15/1997
Doc Name
DEEPE FARM PIT TR APPROVAL PN M-81-302 REVISION TR-6
From
DMG
To
WESTERN MOBILE BOULDER INC
Type & Sequence
TR6
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII STATE OF COLOMDO <br /> DIVISION of MINERALS AND GEOLOGY <br /> Department o1ad,,80 l Resources <br /> 1 31 3 Sherman St., Room 215 <br /> Denver,Culor.ttlo 80_'OS <br /> Phone:(103)866-3567 <br /> FAX.1303)832-8106 <br /> DEPARTMENT OF <br /> September 15, 1997 NATURAL <br /> RESOURCES <br /> Roy Romer <br /> Governor <br /> Mr. David Plummer <br /> James S Lochhead <br /> Western Mobile Boulder, Inc. E.K.T.w D,,Kto, <br /> P.O. Box 18570 Michael B.Long <br /> Boulder, CO 80308 Division Director <br /> RE: Deepe Farm Pit, Technical Revision Approval, Permit No. M-81-302, Revision No. TR-6 <br /> Dear Mr. Plummer: <br /> On September 15, 1997 the Division of Minerals and Geology approved the Technical Revision application submitted to <br /> the Division on May 02, 1997, addressing the following: <br /> Modify the side slopes and final elevations of a portion of the berm along the southeast side of the Deepe Farm Pit. <br /> The terms of the Technical Revision No. 6 approved by the Division are hereby incorporated into Permit No. M-81-302. <br /> The conditions of the Division approval are noted below. Please note that all other provisions of Permit No. M-81-302 <br /> remain in full force and effect. <br /> Stipulation No. Description <br /> 5-1 The operator will submit a construction report, including documentation of any test results, within 60 <br /> day of the completion of the earthwork on the Deepe Farm Pit perimeter levee. The report shall detail <br /> how the specifications approved in technical revision TR-06 were achieved. The operator will also <br /> provide a certification from the construction quality assurance engineer that the levee modifications were <br /> completed in accordance with the design approved in the technical revision. <br /> 5-2 All areas on the out slopes of the levee must be protected by the establishment of vegetation or the <br /> placement of riprap. If riprap is to be utilized, the rock must be durable and non-slaking. <br /> If you have any questions, please contact me. <br /> Sincerely, <br /> t Gregg lre <br /> Environmental Protection Specialist <br /> cc: Mike Hart, Han Environmental " <br /> Jeffrey S. Lipton, University of Colorado at Boulder <br /> M 105SI MM'.TEMPMRVO-'ID2.GRS <br />
The URL can be used to link to this page
Your browser does not support the video tag.