Laserfiche WebLink
STIPULATION N0. 2 <br />• IMMEDIATELY FOLLOWING STREAM CHANNEL RELOCATION CONSTRUCTION AND BEFORE <br />REROUTING THE PURGATOIRE BACK INTO ITS PERMANENT BANKS, WYOMING FUELS <br />COMPANY MUST COMPLETE A SURVEY OF THE NEWLY CONSTRUCTED CHANNEL. THE <br />COMPONENTS OF THE SURVEY ARE DETAILED BELOW. <br />EACH FOLLOWINGYEAR, DURING THE MONTH OF FEBRUARY (COINCIDING WITH <br />LOW-FLOW), WYOMING FUELS MUST RESURVEY ALL OF THE FOLLOWING REQUIRED <br />COMPONENTS OF THE CHANNEL AND SUBMIT THIS INFORMATION TO THE DIVISION <br />BY MAY 1ST OF EACH YEAR. <br />1. FIVE CROSS-SECTIONAL SURVEYS OF THE STREAM RELOCATION, TO BE AGREED <br />UPON BY THE DIVISION PRIOR TO THE SURVEY. <br />2. A LONGITUDINAL PROFILE OF THE STREAM BED FROM 50 FEET ABOVE THE <br />BRIDGE CROSSING THE PURGATOIRE RIVER, EXTENDING TO 100 FEET BELOW <br />THE STREAM RELOCATION SECTION. <br />3. A MONUMENT TO BE PLACED ON THE NORTH BANK OF THE RELOCATED <br />PURGATOIRE RIVER IN THE STRAIGHT PORTION OF THE CHANNEL RELOCATION <br />FOR THE PURPOSE OF MEASURING BANK MOVEMENT. THIS MONUMENT MUST BE <br />PLACED IN AN AREA WHERE NO FUTURE DISTURBANCE WILL OCCUR. <br />The bond submitted for total riprapping of the relocated channel section will <br />be held until such time as Wyoming Fuels collects sufficient information for <br />• the Division to determine that the channel is stable. <br />/wjh <br />8414E <br />U <br />