My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-01-28_REVISION - M1999120 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999120
>
2005-01-28_REVISION - M1999120 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:55:54 PM
Creation date
11/21/2007 8:40:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999120
IBM Index Class Name
Revision
Doc Date
1/28/2005
Doc Name
Revised Rationale for Recommendation for Approval over Objections
From
DMG
To
Ross Bachofer
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~n4 - I <br />~/ <br />Revised Rationale for Recommendation for Approval over Objections; <br />Regular 112 Construction Materials Amendment Application, <br />L. G. Everist, Inc. ~ <br />Fort Lupton Sand and Gravel, File No. M-1999-120 <br />January 28, 2005 ,~ <br />Introduction <br />On January 26, 2004 the Division of Minerals and Geology ("Division") issued its recommendation for <br />approval of a 112 Construction Materials Amendment Application, over objections. This document is <br />intended to provide a basis for the Division's recommended approval over concerns and reasons for <br />objection to the Fort Lupton S & G amendment application, File No. M-1999-120 <br />The L.G Everist, Inc. amendment application was found complete and considered filed with the <br />Division on October 12, 2004. The site is located 2 miles northwest of Fort Lupton, Weld County, <br />Colorado. The property is located in Section 30, Township 2 North, Range 66 West of the Sixth <br />Principal Meridian. The current permit azea is 85 acres in size, 78 acres of which is being mined. The <br />amendment proposes to add 212 acres to the permit azea consisting of 5 additional mining phases to the <br />mine plan. The total site will consist of 7 separate pits. The active pit will be dewatered during the <br />mining process. <br />The proposed post-mined land use for the site is for seven water storage reservoirs; each newly <br />proposed reservoir will be surrounded by a separate sluny wall. Reclamation at the site includes some <br />grading of the disturbed acreage, plus topsoil replacement and seeding and planting of the exposed <br />edges of the pit. <br />I. OBJECTIONS: <br />The Division received one objection from the following individual during the initial public comment <br />period, which ended on December 1, 2004. <br />Obiector / Dated Date Received <br />Ross Bachofer '/ 29-October-04 1-November-04 <br />11566 WCR 18 <br />Fort Lupton, CO 80621 <br />A pre-heazing conference was scheduled for January 28, 2005 at 10:00 AM at 1313 Sherman St., <br />Denver, CO 80203, Conference Rm. 318 <br />II. ISSUES RAISED BY OBJECTING PARTIES: <br />Issues raised by objecting parties during the comment period aze listed below, along with the names ofthe <br />objectors. The Division's response to objection issues follows. Issues aze listed under the section of the <br />~, ~ ~~1~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.