talus 510130
<br />i
<br />Patented mineral
<br />claim boundary line
<br />s
<br />I
<br />I
<br />i
<br />UNEXPECTED NO 1
<br />MS 18513
<br />talus slope
<br />T
<br />ti
<br />it
<br />I
<br />t
<br />i
<br />I,
<br />i
<br />patented mineral
<br />claim boundary line
<br />UNEXPECTED NO 2
<br />MS 18513
<br />e
<br />Ohwiler Ridge diversion structure build in 1997 `
<br />drainage from outside of b 'Id' \
<br />10.920'
<br />talus slope
<br />INCAS
<br />MS 17117
<br />patented mineral
<br />claim boundary line
<br />talus slope area to be reclaimed after any rock is
<br />removed to fill open cuts, area to have crushed
<br />rock added to top of talus slope rock to smooth
<br />surface area, no soil applied or seeding attempted
<br />Ohwiler Ridge
<br />talus slope for waste rock source
<br />for backfiling open cuts, 2004
<br />r area of mining - either surface
<br />cut and fill or underground mining
<br />adjoining uses, INCAS NO 1
<br />talus slope wildlife habitat MS 18511
<br />patented mineral
<br />claim boundary line
<br />- 11 pop'
<br />mining within permit boundary is contained /
<br />within open cut area, labeled ADITS, or vein
<br />structures: each year's mining activity will be
<br />reported on annual report showing location,
<br />gage moved, and square feet disturbed 11//
<br />surface open cut and fill and underground
<br />mining area to have reclamation phased
<br />with simultaneous open cut mining
<br />area to be filled, graded, ripped,
<br />soil applied, mulched and seeded
<br />San Juan National Forest
<br />PS Q; \ talus slope
<br />�1r
<br />Oh,N11et Ridge
<br />San Juan National Forest
<br />ui logs + s Y --T- 1 '1
<br />is into ditches diverting water to ADIT 12 /
<br />downslope of ridge ADIT 13 ADIT 11
<br />ADIT to be backfilled with
<br />talus slope processing plant - 60 x 80' �� waste rock and reclaimed to
<br />build in 1997 � surrounding terrain contours
<br />\ I \ soil applied, mulched and seeded 11'080'
<br />1 , trees, aspen and pine
<br />F' open cut mining and tailings building site to have wood and steel portions I' 9 9
<br />trees, disposal area, 120' x 350',
<br />1 aspen an 10 removed end transferred to floors, concrete walls storm water f ow road u be graded into terrain cuts 10' wide x earl length,
<br />d 960' to he pushed in on concrete floors, waste rock yearly 9th,
<br />pine P diversion structure contours, ripped, soil applied,
<br />added to conform to terrain contours, area to be mulched and seeded cuts labeled by year
<br />graded, ripped, soil applied, mulched, and seeded all old ore dumps will be removed
<br />storm water structure to be reclaimed
<br />into surrounding contours, ripped, durin, mining process and will tailings disposed of in open cuts
<br />g p storm water structure to be reclained
<br />1 soil applied, mulched and seeded either be processed or used as fill into surrounding contours, ripped
<br />in cot tour depression 1995-2004 \ ADIT 10 >< soil applied, mulched and seeded
<br />trees, aspen and pine � \ \ 11,040'
<br />storm water flow jeep into hi road to be io access
<br />on inside of road back into historic carrel ion
<br />\ \\ 10,920'
<br />ADIT to be backfilled with _ _ /
<br />trees, aspen and pine
<br />jeep trail
<br />adjoining uses,
<br />Wildlife habitat
<br />waste rock and reclaimed to i open cut area to be filled and \
<br />surrounding terrain contours s +ils stockpile area
<br />soil applied, mulched and seeded reclaimed during mining and
<br />reclamation simultaneous phases storm water flow t'l� 2004
<br />diversion structure
<br />Permit Area 9.94 acre projected line of vein open pit mine cut to be surge'
<br />talus slope storage for storm water, \�
<br />- water to soak into strata \ , road to be storm water flow 17,000,
<br />132
<br />started in 1995 on inside of road
<br />213
<br />\ ADIT to be removed during open
<br />2007- �` \•
<br />_ e srvils stockpile will 1
<br />jeep trail not passible cut mining, any open tunnels in 2pp1 be removed and
<br />10'880 crusher building is portable in area of open pit hntil op l will 1 temporarily sealed Opt ral Plied to mine reclamation areas and jeep trail
<br />111 until open cut is backfilled 2 th,n the soils stockpile area will be
<br />and can be removed from site p
<br />during reclamation ADIT 5 003 2013 glided, ripped, mulched, and seeded
<br />2
<br />ADIT 3 21301 20p0
<br />w \ 2 1999
<br />storm water flow 10,960'
<br />'� 20133 21313 1998 ' � containment structure
<br />Portable crushing plant 1gg5 ADIT b adjoining use
<br />l x 12' in 1995 & tRnr. _ i t ,_�`r•r- s
<br />—�- `IT a f -- ructure o be reclaimed - :dultat
<br />10 xl.0' In 1997 ��� ,, _ .��' 1 >^=�. _ - •- '
<br />rte,•`` - into surrounding contours. riuped,
<br />gg5 .4� I. ��:.
<br />- 10,840' 1 \ y soil applied, mulched and scsded
<br />location of temporary processing -per rcggT 1895 _
<br />IT to be 6 10
<br />plant, 1 & 2 ton per ley pilot Plants, 1999- ' ackfilled '920'
<br />1995, 1996, and 1997 -- u Q p \ rock and with waste
<br />temporary { reclaimed 9 surrounding
<br />buildings of 8' x 12' size � terrain contours, 1995
<br />soil e
<br />pplied, mulched and
<br />y :, <--•�� seeded
<br />jeep access road to be put
<br />10,800' / 199 \
<br />back into historic condition / Northern Min gals, Inc. open cut
<br />ADIT 8 mining area fom 1986, 4 stepped \ 10,880,
<br />r \l 1
<br />/ 1 \ bench cuts, Otal area, 50' x 350'
<br />1 A IT 7
<br />trees, aspen and pine I I ADIT 6 1995, open cut roes blished
<br />10,680'
<br />10,640
<br />10,760 -�
<br />/ — \
<br />Pony Eed line limestone outcrop, Northern Minerals, Inc. open
<br />a
<br />lep trail projected line of exposure cut mining area reestablished
<br />temporary jeep trail to in limestone parallel to sloping
<br />replace old jeep trail limestone formation old pack trail
<br />� swan water flow \ 1
<br />I version structure \ \ road u be graded into applied, Q
<br />11\ contours, ripped, soil applied, ,8413,
<br />/ mulched and seeded
<br />ADIT 2
<br />/1ty/ all old ore dump s will be removed NORTH
<br />during mining process and will
<br />storm water slow _ ADIT be backfilled with waste \ either be processed or used as fill
<br />on inside of road rock and d
<br />d reclaimed to surrounin
<br />� � \ \� in contour depression 1995 - 2004 713'800'
<br />terrain contours, 1995
<br />soil applied, mulched and seeded ' \\
<br />all old ore dumps will be removed �1rr''
<br />during mining ~
<br />r g process end will \ ,,
<br />720 either be processed o d fill
<br />J ��- adjoini'�g uses,
<br />1p use as wildlift habitat \
<br />in contour depression 1995 - 2004 II
<br />ore dumps removal startedt
<br />in 1995, ore processed, wasted,
<br />area - 1 depression reclamation `\ \ or moved to location of ADIT 2 patented mineral
<br />-- area - 11999 and ripped, s reclamation, ��' I _ ore dump claim boundary line
<br />area goaded, ripped, soil applied, ` K \\ / 70
<br />mulched and seeded • ,;?60
<br />\ \ storm water structure to he reclaimed
<br />into surrounding contours, ripped, J
<br />d d eded
<br />sod applied, mulcha an se BLM GPS survey marker
<br />contour 97 and 1 reclamation storm water flow
<br />area - graded, and ed, s reclamation, on inside of road storm water flow
<br />area graded, ,lipped, soil applied.
<br />mulched and seeded diversion stricture \
<br />road to be greed, into terrain
<br />contour depression fill i contours, ripped, soil applied, 10
<br />area, 1999 and 2000 mulched and seeded 1Z0
<br />Ay`ec2 around Aodttbl Crorrosnon�
<br />contour 1 97 an Sion fill ADITS currently open -- ADITS 1 $2 t.✓itit 1pklte l TrC/1: RCUr$O/1�f ��/03
<br />- -- area, 1997 and 1998
<br />-- A.DITStobeopened-- ADITS10 & -3 EXHIBIT E �o�co��ejat %dam
<br />adjoining uses, storm water flow \ }
<br />...il.lnfa t,el.i ♦�. �� \ l .�( �� 313 AD
<br />10,600'
<br />10,560'
<br />storm water structure to be left
<br />intact, surface will be ripped,
<br />pped soil
<br />applied, mulched and seeded
<br />ADIT 1
<br />soils stockpile area
<br />1995 -2004 /
<br />soils stockpile will be removed and
<br />applied to mine reclamation areas and
<br />then the soils stockpile area will be
<br />graded, ripped, mulched, and seeded
<br />ADIT be beckfilled with Patented mineral
<br />/ waste rock and reclaimed to claim boundary line
<br />surrounding terrain contours
<br />soil applied, mulched and seeded
<br />/ San Juan Nation il Fo rest
<br />11 \
<br />BLM GPS survey marker
<br />adjoining uses,
<br />\habitat
<br />70
<br />600
<br />all stormwater structures downslope
<br />Of ADIT 10 will be constructed in 1995,
<br />stormwater stuctures upslope of
<br />ADIT 10 will be built in 1996 and 1997
<br />70
<br />'64Q.
<br />Patented mineral
<br />claim boundary line
<br />i
<br />ITS caved in -- ADITS 3, 4, 5, 6, 7,
<br />8,. 9, 10, 11, 12, & 13
<br />M
<br />In I
<br />RECLAMATION PLAN
<br />e4
<br />10,680 ' �
<br />REVISED 11/13/1994
<br />building size and square feet
<br />L
<br />m
<br />\
<br />INCAS NO 2
<br />c
<br />building size sq ft
<br />plant - - -- 60' x 80' 4,800 sq ft
<br />`RS 18513
<br />lab - - - - - -- 20' x 30' 600 sq It
<br />easments -none
<br />INCAS NO 3
<br />shop - - -- 30' x 40' 1,200 sq ft
<br />_
<br />N1S 18513 k
<br />crushin 10' x 20' 200 sgft
<br />00 sq ft
<br />patented mineral
<br />N
<br />0 0-6
<br />tote
<br />claim boundary line
<br />patented mineral
<br />all rtructures are proposed
<br />claim boundary line
<br />y
<br />DEADWOOD GULCH MINERALS COMPANY \
<br />outdoor privy location
<br />(DGMC)
<br />"
<br />\
<br />adjoining uses,
<br />trees, aspen and pine
<br />Co
<br />Wildlife habitat
<br />HESPERUS, CO 81326
<br />\ _
<br />C
<br />_ C)
<br />GPS survey marker
<br />6/27/1994
<br />shop and equipment storage
<br />� =9
<br />BLM
<br />= '
<br />30' x 40', build in 1997
<br />SEP 0 2 2003
<br />v
<br />`-�
<br />San Juan National Forest
<br />BOB HILL
<br />storm water flow
<br />Z
<br />assay lab - 20' x 0'
<br />Ohwiler Ridge diversion structure build in 1997 `
<br />drainage from outside of b 'Id' \
<br />10.920'
<br />talus slope
<br />INCAS
<br />MS 17117
<br />patented mineral
<br />claim boundary line
<br />talus slope area to be reclaimed after any rock is
<br />removed to fill open cuts, area to have crushed
<br />rock added to top of talus slope rock to smooth
<br />surface area, no soil applied or seeding attempted
<br />Ohwiler Ridge
<br />talus slope for waste rock source
<br />for backfiling open cuts, 2004
<br />r area of mining - either surface
<br />cut and fill or underground mining
<br />adjoining uses, INCAS NO 1
<br />talus slope wildlife habitat MS 18511
<br />patented mineral
<br />claim boundary line
<br />- 11 pop'
<br />mining within permit boundary is contained /
<br />within open cut area, labeled ADITS, or vein
<br />structures: each year's mining activity will be
<br />reported on annual report showing location,
<br />gage moved, and square feet disturbed 11//
<br />surface open cut and fill and underground
<br />mining area to have reclamation phased
<br />with simultaneous open cut mining
<br />area to be filled, graded, ripped,
<br />soil applied, mulched and seeded
<br />San Juan National Forest
<br />PS Q; \ talus slope
<br />�1r
<br />Oh,N11et Ridge
<br />San Juan National Forest
<br />ui logs + s Y --T- 1 '1
<br />is into ditches diverting water to ADIT 12 /
<br />downslope of ridge ADIT 13 ADIT 11
<br />ADIT to be backfilled with
<br />talus slope processing plant - 60 x 80' �� waste rock and reclaimed to
<br />build in 1997 � surrounding terrain contours
<br />\ I \ soil applied, mulched and seeded 11'080'
<br />1 , trees, aspen and pine
<br />F' open cut mining and tailings building site to have wood and steel portions I' 9 9
<br />trees, disposal area, 120' x 350',
<br />1 aspen an 10 removed end transferred to floors, concrete walls storm water f ow road u be graded into terrain cuts 10' wide x earl length,
<br />d 960' to he pushed in on concrete floors, waste rock yearly 9th,
<br />pine P diversion structure contours, ripped, soil applied,
<br />added to conform to terrain contours, area to be mulched and seeded cuts labeled by year
<br />graded, ripped, soil applied, mulched, and seeded all old ore dumps will be removed
<br />storm water structure to be reclaimed
<br />into surrounding contours, ripped, durin, mining process and will tailings disposed of in open cuts
<br />g p storm water structure to be reclained
<br />1 soil applied, mulched and seeded either be processed or used as fill into surrounding contours, ripped
<br />in cot tour depression 1995-2004 \ ADIT 10 >< soil applied, mulched and seeded
<br />trees, aspen and pine � \ \ 11,040'
<br />storm water flow jeep into hi road to be io access
<br />on inside of road back into historic carrel ion
<br />\ \\ 10,920'
<br />ADIT to be backfilled with _ _ /
<br />trees, aspen and pine
<br />jeep trail
<br />adjoining uses,
<br />Wildlife habitat
<br />waste rock and reclaimed to i open cut area to be filled and \
<br />surrounding terrain contours s +ils stockpile area
<br />soil applied, mulched and seeded reclaimed during mining and
<br />reclamation simultaneous phases storm water flow t'l� 2004
<br />diversion structure
<br />Permit Area 9.94 acre projected line of vein open pit mine cut to be surge'
<br />talus slope storage for storm water, \�
<br />- water to soak into strata \ , road to be storm water flow 17,000,
<br />132
<br />started in 1995 on inside of road
<br />213
<br />\ ADIT to be removed during open
<br />2007- �` \•
<br />_ e srvils stockpile will 1
<br />jeep trail not passible cut mining, any open tunnels in 2pp1 be removed and
<br />10'880 crusher building is portable in area of open pit hntil op l will 1 temporarily sealed Opt ral Plied to mine reclamation areas and jeep trail
<br />111 until open cut is backfilled 2 th,n the soils stockpile area will be
<br />and can be removed from site p
<br />during reclamation ADIT 5 003 2013 glided, ripped, mulched, and seeded
<br />2
<br />ADIT 3 21301 20p0
<br />w \ 2 1999
<br />storm water flow 10,960'
<br />'� 20133 21313 1998 ' � containment structure
<br />Portable crushing plant 1gg5 ADIT b adjoining use
<br />l x 12' in 1995 & tRnr. _ i t ,_�`r•r- s
<br />—�- `IT a f -- ructure o be reclaimed - :dultat
<br />10 xl.0' In 1997 ��� ,, _ .��' 1 >^=�. _ - •- '
<br />rte,•`` - into surrounding contours. riuped,
<br />gg5 .4� I. ��:.
<br />- 10,840' 1 \ y soil applied, mulched and scsded
<br />location of temporary processing -per rcggT 1895 _
<br />IT to be 6 10
<br />plant, 1 & 2 ton per ley pilot Plants, 1999- ' ackfilled '920'
<br />1995, 1996, and 1997 -- u Q p \ rock and with waste
<br />temporary { reclaimed 9 surrounding
<br />buildings of 8' x 12' size � terrain contours, 1995
<br />soil e
<br />pplied, mulched and
<br />y :, <--•�� seeded
<br />jeep access road to be put
<br />10,800' / 199 \
<br />back into historic condition / Northern Min gals, Inc. open cut
<br />ADIT 8 mining area fom 1986, 4 stepped \ 10,880,
<br />r \l 1
<br />/ 1 \ bench cuts, Otal area, 50' x 350'
<br />1 A IT 7
<br />trees, aspen and pine I I ADIT 6 1995, open cut roes blished
<br />10,680'
<br />10,640
<br />10,760 -�
<br />/ — \
<br />Pony Eed line limestone outcrop, Northern Minerals, Inc. open
<br />a
<br />lep trail projected line of exposure cut mining area reestablished
<br />temporary jeep trail to in limestone parallel to sloping
<br />replace old jeep trail limestone formation old pack trail
<br />� swan water flow \ 1
<br />I version structure \ \ road u be graded into applied, Q
<br />11\ contours, ripped, soil applied, ,8413,
<br />/ mulched and seeded
<br />ADIT 2
<br />/1ty/ all old ore dump s will be removed NORTH
<br />during mining process and will
<br />storm water slow _ ADIT be backfilled with waste \ either be processed or used as fill
<br />on inside of road rock and d
<br />d reclaimed to surrounin
<br />� � \ \� in contour depression 1995 - 2004 713'800'
<br />terrain contours, 1995
<br />soil applied, mulched and seeded ' \\
<br />all old ore dumps will be removed �1rr''
<br />during mining ~
<br />r g process end will \ ,,
<br />720 either be processed o d fill
<br />J ��- adjoini'�g uses,
<br />1p use as wildlift habitat \
<br />in contour depression 1995 - 2004 II
<br />ore dumps removal startedt
<br />in 1995, ore processed, wasted,
<br />area - 1 depression reclamation `\ \ or moved to location of ADIT 2 patented mineral
<br />-- area - 11999 and ripped, s reclamation, ��' I _ ore dump claim boundary line
<br />area goaded, ripped, soil applied, ` K \\ / 70
<br />mulched and seeded • ,;?60
<br />\ \ storm water structure to he reclaimed
<br />into surrounding contours, ripped, J
<br />d d eded
<br />sod applied, mulcha an se BLM GPS survey marker
<br />contour 97 and 1 reclamation storm water flow
<br />area - graded, and ed, s reclamation, on inside of road storm water flow
<br />area graded, ,lipped, soil applied.
<br />mulched and seeded diversion stricture \
<br />road to be greed, into terrain
<br />contour depression fill i contours, ripped, soil applied, 10
<br />area, 1999 and 2000 mulched and seeded 1Z0
<br />Ay`ec2 around Aodttbl Crorrosnon�
<br />contour 1 97 an Sion fill ADITS currently open -- ADITS 1 $2 t.✓itit 1pklte l TrC/1: RCUr$O/1�f ��/03
<br />- -- area, 1997 and 1998
<br />-- A.DITStobeopened-- ADITS10 & -3 EXHIBIT E �o�co��ejat %dam
<br />adjoining uses, storm water flow \ }
<br />...il.lnfa t,el.i ♦�. �� \ l .�( �� 313 AD
<br />10,600'
<br />10,560'
<br />storm water structure to be left
<br />intact, surface will be ripped,
<br />pped soil
<br />applied, mulched and seeded
<br />ADIT 1
<br />soils stockpile area
<br />1995 -2004 /
<br />soils stockpile will be removed and
<br />applied to mine reclamation areas and
<br />then the soils stockpile area will be
<br />graded, ripped, mulched, and seeded
<br />ADIT be beckfilled with Patented mineral
<br />/ waste rock and reclaimed to claim boundary line
<br />surrounding terrain contours
<br />soil applied, mulched and seeded
<br />/ San Juan Nation il Fo rest
<br />11 \
<br />BLM GPS survey marker
<br />adjoining uses,
<br />\habitat
<br />70
<br />600
<br />all stormwater structures downslope
<br />Of ADIT 10 will be constructed in 1995,
<br />stormwater stuctures upslope of
<br />ADIT 10 will be built in 1996 and 1997
<br />70
<br />'64Q.
<br />Patented mineral
<br />claim boundary line
<br />i
<br />ITS caved in -- ADITS 3, 4, 5, 6, 7,
<br />8,. 9, 10, 11, 12, & 13
<br />M
<br />RECLAMATION PLAN
<br />10,680 ' �
<br />REVISED 11/13/1994
<br />\.Q..
<br />M.Y
<br />�`
<br />L
<br />m
<br />\
<br />c
<br />/
<br />easments -none
<br />_
<br />ut4 -ids -none
<br />SCALE 1" = 50'
<br />��
<br />N
<br />0 0-6
<br />cuherts - none
<br />all rtructures are proposed
<br />y
<br />DEADWOOD GULCH MINERALS COMPANY \
<br />^
<br />(DGMC)
<br />"
<br />\
<br />PO BOX 96
<br />Co
<br />HESPERUS, CO 81326
<br />_ C)
<br />GPS survey marker
<br />6/27/1994
<br />RECEIVED
<br />� =9
<br />BLM
<br />= '
<br />SEP 0 2 2003
<br />v
<br />`-�
<br />San Juan National Forest
<br />BOB HILL
<br />Z
<br />Oivis'on d Minerals and Geology
<br />y
<br />E `9 o
<br />\
<br />IL0U-00
<br />
|