Laserfiche WebLink
talus 510130 <br />i <br />Patented mineral <br />claim boundary line <br />s <br />I <br />I <br />i <br />UNEXPECTED NO 1 <br />MS 18513 <br />talus slope <br />T <br />ti <br />it <br />I <br />t <br />i <br />I, <br />i <br />patented mineral <br />claim boundary line <br />UNEXPECTED NO 2 <br />MS 18513 <br />e <br />Ohwiler Ridge diversion structure build in 1997 ` <br />drainage from outside of b 'Id' \ <br />10.920' <br />talus slope <br />INCAS <br />MS 17117 <br />patented mineral <br />claim boundary line <br />talus slope area to be reclaimed after any rock is <br />removed to fill open cuts, area to have crushed <br />rock added to top of talus slope rock to smooth <br />surface area, no soil applied or seeding attempted <br />Ohwiler Ridge <br />talus slope for waste rock source <br />for backfiling open cuts, 2004 <br />r area of mining - either surface <br />cut and fill or underground mining <br />adjoining uses, INCAS NO 1 <br />talus slope wildlife habitat MS 18511 <br />patented mineral <br />claim boundary line <br />- 11 pop' <br />mining within permit boundary is contained / <br />within open cut area, labeled ADITS, or vein <br />structures: each year's mining activity will be <br />reported on annual report showing location, <br />gage moved, and square feet disturbed 11// <br />surface open cut and fill and underground <br />mining area to have reclamation phased <br />with simultaneous open cut mining <br />area to be filled, graded, ripped, <br />soil applied, mulched and seeded <br />San Juan National Forest <br />PS Q; \ talus slope <br />�1r <br />Oh,N11et Ridge <br />San Juan National Forest <br />ui logs + s Y --T- 1 '1 <br />is into ditches diverting water to ADIT 12 / <br />downslope of ridge ADIT 13 ADIT 11 <br />ADIT to be backfilled with <br />talus slope processing plant - 60 x 80' �� waste rock and reclaimed to <br />build in 1997 � surrounding terrain contours <br />\ I \ soil applied, mulched and seeded 11'080' <br />1 , trees, aspen and pine <br />F' open cut mining and tailings building site to have wood and steel portions I' 9 9 <br />trees, disposal area, 120' x 350', <br />1 aspen an 10 removed end transferred to floors, concrete walls storm water f ow road u be graded into terrain cuts 10' wide x earl length, <br />d 960' to he pushed in on concrete floors, waste rock yearly 9th, <br />pine P diversion structure contours, ripped, soil applied, <br />added to conform to terrain contours, area to be mulched and seeded cuts labeled by year <br />graded, ripped, soil applied, mulched, and seeded all old ore dumps will be removed <br />storm water structure to be reclaimed <br />into surrounding contours, ripped, durin, mining process and will tailings disposed of in open cuts <br />g p storm water structure to be reclained <br />1 soil applied, mulched and seeded either be processed or used as fill into surrounding contours, ripped <br />in cot tour depression 1995-2004 \ ADIT 10 >< soil applied, mulched and seeded <br />trees, aspen and pine � \ \ 11,040' <br />storm water flow jeep into hi road to be io access <br />on inside of road back into historic carrel ion <br />\ \\ 10,920' <br />ADIT to be backfilled with _ _ / <br />trees, aspen and pine <br />jeep trail <br />adjoining uses, <br />Wildlife habitat <br />waste rock and reclaimed to i open cut area to be filled and \ <br />surrounding terrain contours s +ils stockpile area <br />soil applied, mulched and seeded reclaimed during mining and <br />reclamation simultaneous phases storm water flow t'l� 2004 <br />diversion structure <br />Permit Area 9.94 acre projected line of vein open pit mine cut to be surge' <br />talus slope storage for storm water, \� <br />- water to soak into strata \ , road to be storm water flow 17,000, <br />132 <br />started in 1995 on inside of road <br />213 <br />\ ADIT to be removed during open <br />2007- �` \• <br />_ e srvils stockpile will 1 <br />jeep trail not passible cut mining, any open tunnels in 2pp1 be removed and <br />10'880 crusher building is portable in area of open pit hntil op l will 1 temporarily sealed Opt ral Plied to mine reclamation areas and jeep trail <br />111 until open cut is backfilled 2 th,n the soils stockpile area will be <br />and can be removed from site p <br />during reclamation ADIT 5 003 2013 glided, ripped, mulched, and seeded <br />2 <br />ADIT 3 21301 20p0 <br />w \ 2 1999 <br />storm water flow 10,960' <br />'� 20133 21313 1998 ' � containment structure <br />Portable crushing plant 1gg5 ADIT b adjoining use <br />l x 12' in 1995 & tRnr. _ i t ,_�`r•r- s <br />—�- `IT a f -- ructure o be reclaimed - :dultat <br />10 xl.0' In 1997 ��� ,, _ .��' 1 >^=�. _ - •- ' <br />rte,•`` - into surrounding contours. riuped, <br />gg5 .4� I. ��:. <br />- 10,840' 1 \ y soil applied, mulched and scsded <br />location of temporary processing -per rcggT 1895 _ <br />IT to be 6 10 <br />plant, 1 & 2 ton per ley pilot Plants, 1999- ' ackfilled '920' <br />1995, 1996, and 1997 -- u Q p \ rock and with waste <br />temporary { reclaimed 9 surrounding <br />buildings of 8' x 12' size � terrain contours, 1995 <br />soil e <br />pplied, mulched and <br />y :, <--•�� seeded <br />jeep access road to be put <br />10,800' / 199 \ <br />back into historic condition / Northern Min gals, Inc. open cut <br />ADIT 8 mining area fom 1986, 4 stepped \ 10,880, <br />r \l 1 <br />/ 1 \ bench cuts, Otal area, 50' x 350' <br />1 A IT 7 <br />trees, aspen and pine I I ADIT 6 1995, open cut roes blished <br />10,680' <br />10,640 <br />10,760 -� <br />/ — \ <br />Pony Eed line limestone outcrop, Northern Minerals, Inc. open <br />a <br />lep trail projected line of exposure cut mining area reestablished <br />temporary jeep trail to in limestone parallel to sloping <br />replace old jeep trail limestone formation old pack trail <br />� swan water flow \ 1 <br />I version structure \ \ road u be graded into applied, Q <br />11\ contours, ripped, soil applied, ,8413, <br />/ mulched and seeded <br />ADIT 2 <br />/1ty/ all old ore dump s will be removed NORTH <br />during mining process and will <br />storm water slow _ ADIT be backfilled with waste \ either be processed or used as fill <br />on inside of road rock and d <br />d reclaimed to surrounin <br />� � \ \� in contour depression 1995 - 2004 713'800' <br />terrain contours, 1995 <br />soil applied, mulched and seeded ' \\ <br />all old ore dumps will be removed �1rr'' <br />during mining ~ <br />r g process end will \ ,, <br />720 either be processed o d fill <br />J ��- adjoini'�g uses, <br />1p use as wildlift habitat \ <br />in contour depression 1995 - 2004 II <br />ore dumps removal startedt <br />in 1995, ore processed, wasted, <br />area - 1 depression reclamation `\ \ or moved to location of ADIT 2 patented mineral <br />-- area - 11999 and ripped, s reclamation, ��' I _ ore dump claim boundary line <br />area goaded, ripped, soil applied, ` K \\ / 70 <br />mulched and seeded • ,;?60 <br />\ \ storm water structure to he reclaimed <br />into surrounding contours, ripped, J <br />d d eded <br />sod applied, mulcha an se BLM GPS survey marker <br />contour 97 and 1 reclamation storm water flow <br />area - graded, and ed, s reclamation, on inside of road storm water flow <br />area graded, ,lipped, soil applied. <br />mulched and seeded diversion stricture \ <br />road to be greed, into terrain <br />contour depression fill i contours, ripped, soil applied, 10 <br />area, 1999 and 2000 mulched and seeded 1Z0 <br />Ay`ec2 around Aodttbl Crorrosnon� <br />contour 1 97 an Sion fill ADITS currently open -- ADITS 1 $2 t.✓itit 1pklte l TrC/1: RCUr$O/1�f ��/03 <br />- -- area, 1997 and 1998 <br />-- A.DITStobeopened-- ADITS10 & -3 EXHIBIT E �o�co��ejat %dam <br />adjoining uses, storm water flow \ } <br />...il.lnfa t,el.i ♦�. �� \ l .�( �� 313 AD <br />10,600' <br />10,560' <br />storm water structure to be left <br />intact, surface will be ripped, <br />pped soil <br />applied, mulched and seeded <br />ADIT 1 <br />soils stockpile area <br />1995 -2004 / <br />soils stockpile will be removed and <br />applied to mine reclamation areas and <br />then the soils stockpile area will be <br />graded, ripped, mulched, and seeded <br />ADIT be beckfilled with Patented mineral <br />/ waste rock and reclaimed to claim boundary line <br />surrounding terrain contours <br />soil applied, mulched and seeded <br />/ San Juan Nation il Fo rest <br />11 \ <br />BLM GPS survey marker <br />adjoining uses, <br />\habitat <br />70 <br />600 <br />all stormwater structures downslope <br />Of ADIT 10 will be constructed in 1995, <br />stormwater stuctures upslope of <br />ADIT 10 will be built in 1996 and 1997 <br />70 <br />'64Q. <br />Patented mineral <br />claim boundary line <br />i <br />ITS caved in -- ADITS 3, 4, 5, 6, 7, <br />8,. 9, 10, 11, 12, & 13 <br />M <br />In I <br />RECLAMATION PLAN <br />e4 <br />10,680 ' � <br />REVISED 11/13/1994 <br />building size and square feet <br />L <br />m <br />\ <br />INCAS NO 2 <br />c <br />building size sq ft <br />plant - - -- 60' x 80' 4,800 sq ft <br />`RS 18513 <br />lab - - - - - -- 20' x 30' 600 sq It <br />easments -none <br />INCAS NO 3 <br />shop - - -- 30' x 40' 1,200 sq ft <br />_ <br />N1S 18513 k <br />crushin 10' x 20' 200 sgft <br />00 sq ft <br />patented mineral <br />N <br />0 0-6 <br />tote <br />claim boundary line <br />patented mineral <br />all rtructures are proposed <br />claim boundary line <br />y <br />DEADWOOD GULCH MINERALS COMPANY \ <br />outdoor privy location <br />(DGMC) <br />" <br />\ <br />adjoining uses, <br />trees, aspen and pine <br />Co <br />Wildlife habitat <br />HESPERUS, CO 81326 <br />\ _ <br />C <br />_ C) <br />GPS survey marker <br />6/27/1994 <br />shop and equipment storage <br />� =9 <br />BLM <br />= ' <br />30' x 40', build in 1997 <br />SEP 0 2 2003 <br />v <br />`-� <br />San Juan National Forest <br />BOB HILL <br />storm water flow <br />Z <br />assay lab - 20' x 0' <br />Ohwiler Ridge diversion structure build in 1997 ` <br />drainage from outside of b 'Id' \ <br />10.920' <br />talus slope <br />INCAS <br />MS 17117 <br />patented mineral <br />claim boundary line <br />talus slope area to be reclaimed after any rock is <br />removed to fill open cuts, area to have crushed <br />rock added to top of talus slope rock to smooth <br />surface area, no soil applied or seeding attempted <br />Ohwiler Ridge <br />talus slope for waste rock source <br />for backfiling open cuts, 2004 <br />r area of mining - either surface <br />cut and fill or underground mining <br />adjoining uses, INCAS NO 1 <br />talus slope wildlife habitat MS 18511 <br />patented mineral <br />claim boundary line <br />- 11 pop' <br />mining within permit boundary is contained / <br />within open cut area, labeled ADITS, or vein <br />structures: each year's mining activity will be <br />reported on annual report showing location, <br />gage moved, and square feet disturbed 11// <br />surface open cut and fill and underground <br />mining area to have reclamation phased <br />with simultaneous open cut mining <br />area to be filled, graded, ripped, <br />soil applied, mulched and seeded <br />San Juan National Forest <br />PS Q; \ talus slope <br />�1r <br />Oh,N11et Ridge <br />San Juan National Forest <br />ui logs + s Y --T- 1 '1 <br />is into ditches diverting water to ADIT 12 / <br />downslope of ridge ADIT 13 ADIT 11 <br />ADIT to be backfilled with <br />talus slope processing plant - 60 x 80' �� waste rock and reclaimed to <br />build in 1997 � surrounding terrain contours <br />\ I \ soil applied, mulched and seeded 11'080' <br />1 , trees, aspen and pine <br />F' open cut mining and tailings building site to have wood and steel portions I' 9 9 <br />trees, disposal area, 120' x 350', <br />1 aspen an 10 removed end transferred to floors, concrete walls storm water f ow road u be graded into terrain cuts 10' wide x earl length, <br />d 960' to he pushed in on concrete floors, waste rock yearly 9th, <br />pine P diversion structure contours, ripped, soil applied, <br />added to conform to terrain contours, area to be mulched and seeded cuts labeled by year <br />graded, ripped, soil applied, mulched, and seeded all old ore dumps will be removed <br />storm water structure to be reclaimed <br />into surrounding contours, ripped, durin, mining process and will tailings disposed of in open cuts <br />g p storm water structure to be reclained <br />1 soil applied, mulched and seeded either be processed or used as fill into surrounding contours, ripped <br />in cot tour depression 1995-2004 \ ADIT 10 >< soil applied, mulched and seeded <br />trees, aspen and pine � \ \ 11,040' <br />storm water flow jeep into hi road to be io access <br />on inside of road back into historic carrel ion <br />\ \\ 10,920' <br />ADIT to be backfilled with _ _ / <br />trees, aspen and pine <br />jeep trail <br />adjoining uses, <br />Wildlife habitat <br />waste rock and reclaimed to i open cut area to be filled and \ <br />surrounding terrain contours s +ils stockpile area <br />soil applied, mulched and seeded reclaimed during mining and <br />reclamation simultaneous phases storm water flow t'l� 2004 <br />diversion structure <br />Permit Area 9.94 acre projected line of vein open pit mine cut to be surge' <br />talus slope storage for storm water, \� <br />- water to soak into strata \ , road to be storm water flow 17,000, <br />132 <br />started in 1995 on inside of road <br />213 <br />\ ADIT to be removed during open <br />2007- �` \• <br />_ e srvils stockpile will 1 <br />jeep trail not passible cut mining, any open tunnels in 2pp1 be removed and <br />10'880 crusher building is portable in area of open pit hntil op l will 1 temporarily sealed Opt ral Plied to mine reclamation areas and jeep trail <br />111 until open cut is backfilled 2 th,n the soils stockpile area will be <br />and can be removed from site p <br />during reclamation ADIT 5 003 2013 glided, ripped, mulched, and seeded <br />2 <br />ADIT 3 21301 20p0 <br />w \ 2 1999 <br />storm water flow 10,960' <br />'� 20133 21313 1998 ' � containment structure <br />Portable crushing plant 1gg5 ADIT b adjoining use <br />l x 12' in 1995 & tRnr. _ i t ,_�`r•r- s <br />—�- `IT a f -- ructure o be reclaimed - :dultat <br />10 xl.0' In 1997 ��� ,, _ .��' 1 >^=�. _ - •- ' <br />rte,•`` - into surrounding contours. riuped, <br />gg5 .4� I. ��:. <br />- 10,840' 1 \ y soil applied, mulched and scsded <br />location of temporary processing -per rcggT 1895 _ <br />IT to be 6 10 <br />plant, 1 & 2 ton per ley pilot Plants, 1999- ' ackfilled '920' <br />1995, 1996, and 1997 -- u Q p \ rock and with waste <br />temporary { reclaimed 9 surrounding <br />buildings of 8' x 12' size � terrain contours, 1995 <br />soil e <br />pplied, mulched and <br />y :, <--•�� seeded <br />jeep access road to be put <br />10,800' / 199 \ <br />back into historic condition / Northern Min gals, Inc. open cut <br />ADIT 8 mining area fom 1986, 4 stepped \ 10,880, <br />r \l 1 <br />/ 1 \ bench cuts, Otal area, 50' x 350' <br />1 A IT 7 <br />trees, aspen and pine I I ADIT 6 1995, open cut roes blished <br />10,680' <br />10,640 <br />10,760 -� <br />/ — \ <br />Pony Eed line limestone outcrop, Northern Minerals, Inc. open <br />a <br />lep trail projected line of exposure cut mining area reestablished <br />temporary jeep trail to in limestone parallel to sloping <br />replace old jeep trail limestone formation old pack trail <br />� swan water flow \ 1 <br />I version structure \ \ road u be graded into applied, Q <br />11\ contours, ripped, soil applied, ,8413, <br />/ mulched and seeded <br />ADIT 2 <br />/1ty/ all old ore dump s will be removed NORTH <br />during mining process and will <br />storm water slow _ ADIT be backfilled with waste \ either be processed or used as fill <br />on inside of road rock and d <br />d reclaimed to surrounin <br />� � \ \� in contour depression 1995 - 2004 713'800' <br />terrain contours, 1995 <br />soil applied, mulched and seeded ' \\ <br />all old ore dumps will be removed �1rr'' <br />during mining ~ <br />r g process end will \ ,, <br />720 either be processed o d fill <br />J ��- adjoini'�g uses, <br />1p use as wildlift habitat \ <br />in contour depression 1995 - 2004 II <br />ore dumps removal startedt <br />in 1995, ore processed, wasted, <br />area - 1 depression reclamation `\ \ or moved to location of ADIT 2 patented mineral <br />-- area - 11999 and ripped, s reclamation, ��' I _ ore dump claim boundary line <br />area goaded, ripped, soil applied, ` K \\ / 70 <br />mulched and seeded • ,;?60 <br />\ \ storm water structure to he reclaimed <br />into surrounding contours, ripped, J <br />d d eded <br />sod applied, mulcha an se BLM GPS survey marker <br />contour 97 and 1 reclamation storm water flow <br />area - graded, and ed, s reclamation, on inside of road storm water flow <br />area graded, ,lipped, soil applied. <br />mulched and seeded diversion stricture \ <br />road to be greed, into terrain <br />contour depression fill i contours, ripped, soil applied, 10 <br />area, 1999 and 2000 mulched and seeded 1Z0 <br />Ay`ec2 around Aodttbl Crorrosnon� <br />contour 1 97 an Sion fill ADITS currently open -- ADITS 1 $2 t.✓itit 1pklte l TrC/1: RCUr$O/1�f ��/03 <br />- -- area, 1997 and 1998 <br />-- A.DITStobeopened-- ADITS10 & -3 EXHIBIT E �o�co��ejat %dam <br />adjoining uses, storm water flow \ } <br />...il.lnfa t,el.i ♦�. �� \ l .�( �� 313 AD <br />10,600' <br />10,560' <br />storm water structure to be left <br />intact, surface will be ripped, <br />pped soil <br />applied, mulched and seeded <br />ADIT 1 <br />soils stockpile area <br />1995 -2004 / <br />soils stockpile will be removed and <br />applied to mine reclamation areas and <br />then the soils stockpile area will be <br />graded, ripped, mulched, and seeded <br />ADIT be beckfilled with Patented mineral <br />/ waste rock and reclaimed to claim boundary line <br />surrounding terrain contours <br />soil applied, mulched and seeded <br />/ San Juan Nation il Fo rest <br />11 \ <br />BLM GPS survey marker <br />adjoining uses, <br />\habitat <br />70 <br />600 <br />all stormwater structures downslope <br />Of ADIT 10 will be constructed in 1995, <br />stormwater stuctures upslope of <br />ADIT 10 will be built in 1996 and 1997 <br />70 <br />'64Q. <br />Patented mineral <br />claim boundary line <br />i <br />ITS caved in -- ADITS 3, 4, 5, 6, 7, <br />8,. 9, 10, 11, 12, & 13 <br />M <br />RECLAMATION PLAN <br />10,680 ' � <br />REVISED 11/13/1994 <br />\.Q.. <br />M.Y <br />�` <br />L <br />m <br />\ <br />c <br />/ <br />easments -none <br />_ <br />ut4 -ids -none <br />SCALE 1" = 50' <br />�� <br />N <br />0 0-6 <br />cuherts - none <br />all rtructures are proposed <br />y <br />DEADWOOD GULCH MINERALS COMPANY \ <br />^ <br />(DGMC) <br />" <br />\ <br />PO BOX 96 <br />Co <br />HESPERUS, CO 81326 <br />_ C) <br />GPS survey marker <br />6/27/1994 <br />RECEIVED <br />� =9 <br />BLM <br />= ' <br />SEP 0 2 2003 <br />v <br />`-� <br />San Juan National Forest <br />BOB HILL <br />Z <br />Oivis'on d Minerals and Geology <br />y <br />E `9 o <br />\ <br />IL0U-00 <br />