Laserfiche WebLink
APPENDIX B-1 <br />;~ <br />• <br /> <br />PHOTOGRAPH LOG <br />`Photo <br />Number <br />T Date <br />Descri tion' ' <br />1 September 2001 Underground working confirmatory drilling (CTG-242). <br />2 A ri12002 Concrete plug installation for underground working remediation. <br />3 June 2004 Geogrid cap installation (UG-297). <br />4 June 2004 Soil Liner Fill placement. <br />5 July 2004 Soil Liner Fill compaction. <br />6 June 2004 Soil Liner Fill sampling. <br />7 June 2004 Secondary Underdrain construction. <br />8 June 2004 Leak Detection Trench construction. <br />9 May 2004 Geomembrane deployment. <br />10 May 2004 Geomembrane seaming and observation. <br />11 June 2004 Geomembrane pressure testing and observation. <br />12 Au ust 2004 Drain Cover Fill placement. <br />13 September 2004 HVSCS piping layout. <br />14 September 2004 Leak detection sump construction. <br />October 2004 <br />Golder Associates <br />043-2170 <br />]:b410BSb03-21 ]OWc Cer4fiwpon RepoRPhsse IVC OSA CenUppendiciesUppeMix B Plwmgaptic Lo81B1 PMto®apM1i<CwvnuntatimNppeMix BI Phatogrephic Lo3dsAPPmdix B-1 <br />