Laserfiche WebLink
Ms. Ertca Crosby,,,' _ ~~ `"~ <br />RE Jake Kauffmpn & Son, Inc Wagner%Kaufjman P.~t #3 AmendmentAM-01 - ~ _:; <br />December I5; ~20OS , <br />Page'3 of 6 ''~ <br />. ^ <br />' 3. The acreagexeduction. for.M-1978-327, Kauffman Pit, is currently being prepazed for _::`:~ <br />subnuttale. - ~ <br />Rule 6.4.3 Exhibit C "Pr`e Mining and Mining_Plan Map(sl of Affected`Lands 'I <br />~~ <br />4: The. Kauffman, Pit azea' depicted a "Area Backfilled for,-Recyclafile Conciete and ': ,,'; <br />Asphalt Storage and Processing" has- been backfilled with inert overburden-matenal " <br />from the site: `No asphalt or concrete. was used` in the 6ackfill. This .backfil'led area ~~' <br />will be used for the recycling of asphalt;and concrete, but these materials will not be <br />used as backfill materials-on either the Kauffman'Pit site or Wagner/Kauffman Pit #3 <br />site: ` <br />Rule 6.4.4 Exhibit D -Mine Plan.- _ _ <; <br />5. " ' The topsoil stockpiles in the Phase II pit,aze located in the bottom of the mined out _ ' <br /> pit: Therefore, the topsoil can remain: in its current location (avoiding additional : ^ <br /> handling of the maferral) =until-it is used- for reclamation: - .It is "anticipated tkat the :- ° `: <br /> topsoil in.the Phase II pit-w~lLbe:used 3uring.the liackfillingreclamation of Phase I in - <br /> the 4005-2006 wmterseason. .. ;;_' <br />6: Overburden material" is always segregated and. handled 'sepazately from .topsoil <br /> material. At this point in"the mining and reclamation op¢ratioris, overburden material <br /> is not being stockpiled. Overburden material is being used "directly-for reclamation <br /> : activities. If is anticipated that, overburden material will continue to be used ,in this `' <br /> fashion. : 1 <br />Rule 6.4:5 Exhibit E -Reclamation Plan ' <br />~; :' <br /> <br />y <br />~ <br />^ <br />7: The clay-.bedrock below -the sand and gravel resource will be excavated ^`,~ <br /> approximately 10 feet below its upper surface to- increase reservoif storage volume , ,; ,~ <br /> and provide material for construction ofahe clay liner. The anticipated volume of : ~ <br /> clay to be excavated from-the east:.and-west reservoirs is '141,500 and 69;300 cubic ^ <br /> yards, respectively. " .~ <br />8. It is proposed that the-seed mix presented in the amendment application (AM-O1) be . `• <br /> used'to replace-the seed=mix approved in TR-Ol: `The seed mixture proposed in the ;_ ^ <br /> amendment application has -been used on other properties owned. by the operator in :_ ,^ <br /> :the immediate azea and has„produced a robust stand of pasture grass..- ` ' ;' <br /> ~ <br />9., The internal roads remaining after reclamation will be no wider than 25 feet..Roads ; <br /> will remain to access the reservoirs for operation and maintenance, as well as the ' >^ <br /> reclaimed pasture:-land areas: -Since the 7oads.will be located azound the perimeter of ..:.: ' .":~ <br /> the reservoirs and, along the "reserdoir crests,, no additiorial drainage structures will be .-,", <br /> <br />