Laserfiche WebLink
RULE 8.4.11 <br />RECWMATION COST <br />ULA GRAVEL PIT <br />E%BIBTT'L' <br /> QTY. UNii UNIT COST EXTENDED COST <br />1.) REDUCE REMAINING HIGH WALL 600 LF $4.13 $2,478 <br />2.) REPLACE OVERBURDEN 1667 LCY $0.75 $1,250 <br />3.)PIACE TOPSOIL OVER AREA 15125 lCV $0.75 $11,344 <br />4.) SCARIFY THE HARD PAN 10 ACRE $250.00 $2,500 <br />S.) SEED BED PREPARATION 15 ACRE $125.00 $1,875 <br />6.)FERTILIZER APPLICATION 15 ACRE $28.00 $420 <br />7.) SEEDING DRILLING METHOD 15 ACRE $105.00 $1,575 <br />8.) MULCHING W/ HAY OR STRAW 15 ACRE $165.00 $2,475 <br />9.) WEED CONTROL ALLOWANCE 15 ACRE $35.00 $525 <br />10.) MOBILIZATION & DEMOBILIZATION 1 EA. $1,120.00 $1,120 <br />TOTAL DIRECT COST $25,562 <br />INDIRECT COST <br /> PUBLIC LIABILITY INSURANCE 1.5596 $396.21 <br /> CONTRACTOR PERFORMANCE 80ND COST 1.SSSb $396.21 <br /> CONTRACTOR PROFIT 10.00% $2,556.20 <br /> DIVISION OF MINERALS & GEOLOGY ADMIN. EXPENSE 5.00°,6 $1,278.10 <br /> ADDIT10NAl SUPERVISION 3.00% $766.86 <br /> TOTAL PERFORMANCE BOND AMOUNT $30,955.58 <br /> EXISTING BOND ($23,000.00) <br /> ADDITIONAL BONDING REQUIRED $7,955.58 <br />