Laserfiche WebLink
• <br />E. Topsoil Panagement Plan <br />The topsoil management plan will consist of the following ite~ns: <br />1. Strip the top 6 inches to 1 foot of topsoil with a scrape <br />type machine. <br />2. Using the scraper, relocate the topsoil to the north, ease, <br />and south edges of the site. <br />3. Build screening mounds with the topsoil about 20-3U feet .,ide <br />and 3-5~f gt high. <br />4. Some extra topsoil taken from the west parcel could be used <br />along the perimeters of the other two parcels, if necessary <br />for adequate revegetation. <br />F. Revegetation Plan <br />The planned revegetation is for the perimeters of the three parcels. <br />Trees and shrubs will help provide some cover and nesting areas <br />for wildlife using the ponds, and reduce impacts from vehicular <br />traffic along the County Roads. <br />Preferred species - Cottonwood and lJillow trees are preferred. <br />plethods of planting - Small 5 foot trees will be transl~lantr.d <br />from along the old river channel to locations surroundiml Uie <br />future ponds. <br />P.vailability of species -These trees are available in great <br />nwnbe rs . <br />Proposed time - Planting could begin immediately after Use s~reen- <br />ing mound/roadways are constructed the first year. <br />