Laserfiche WebLink
~ TEST BORING REPORT <br />- <br />~~ ~ <br />9 <br />2' <br />2 L"'9 <br />B <br />_ h <br />eet N <br />. <br />S <br />of <br />~, 3 <br />_ Project: Loveland Ready Mix Slurry Wall File No. 107027-000 <br /> <br />Start: April 9, 2007 <br />= 3 Client; Compass Environmental <br />- Finish: April it, 2007 <br />=_ _ Contractor: Dakota Ddlling Driller: Jerry/Justin <br /> Casin ler <br />Sam Barrel Drillin <br />ui <br />m <br />nt and P <br />ocedures <br />E LH Rep.: G. Snyder <br /> g p g <br />p <br />q <br />e <br />r El <br /> <br />Type <br />HS <br />S/C <br />Rig Make & ModeI:CME-55 evation: 4819.35 <br />Datum: na <br />Inside Diameter (in.) - 1 3l8, 2 - Drill Method:4 1/2" HSA Location: See Borin <br />Plan <br />Hammer Weight (Ib.) 140 - -- Bii Type: Cutting Head Casing: None g <br />Hammer Fall (in.) 30 30 in. -- Hoist/Hammer: Cat-Head Safety Hammer _ <br />~ m Lab orat ory Resu lts <br />o E ~ z° ` a Visual-Manual Identification and Description E _. <br />r. <br />m> N , <br />o c <br />a ti rn <br />~ U m o <br />C <br /> <br />~ N <br />m ~ <br />E ~ <br />~ <br />(Density/consistency, cobr, GROUP NAME, max. paNCle size, of <br />~? y <br />~ o o <br />~ <br />^, <br />v o <br />UJ, w ~ ~ structure, odor, moisture, optional descriptions, geologic interpretation) ~ `m > a ~ o o rn =y <br /> rn 3 ~ r7 rn LL ~ a 7 rn <br /> 50! -7 SAMIE AS ABOVE. <br /> 50l C-5 SAME AS ABOVE. <br /> 6" <br /> 4]9 <br />-ao - SAME AS ABOVE. <br /> 3" End of exploration at 30.3 ft <br /> a]0 <br />-35 <br /> 478 <br />-00 <br /> d]7 <br />45 <br /> 4i] <br />50 <br />Maxiumum Darticle size is determined'nydirectobservation within the limitations of the sampler LH•9 <br />i <br />No <br />B <br /> ng <br />. <br />or <br />NOTE: Soil itlentification based on visual•manual methotls of the USCS as Aractlced by Lyman Henn, Inc. <br />