My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-28_REVISION - M1992016
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992016
>
2003-05-28_REVISION - M1992016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:36:01 PM
Creation date
11/21/2007 8:29:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992016
IBM Index Class Name
Revision
Doc Date
5/28/2003
Doc Name
Amendment Approval
From
DMG
To
Rocky Mountain Materials & Asphalt Inc
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 004 <br />Date : 05/21/2003 <br />User: JD1 <br />State :Colorado <br />County :Fremont <br />Site :Penrose Ranch Pit <br />Agency or organization name : DMG <br />Permit or other job action : Phased reclamation - 100 acres <br />Task description :Grade topsoil on backfilled <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D6R LGP - 6S Horsepower : 185 <br />Blade type : Shaight <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br />volume : 9,035 LCY factor : NA volume : 9,035 LCY <br /> <br />Source of estimated volume :calculation <br />Source of estimated swell factor :NA <br />~: <br />< <br />s <br />: <br />,: <br />, , <br />HOURLY PRODUCTION Job CondRion Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted houriy production : 444.6 LCY/hr Dozing method : 1.20 (slot) <br /> Visibility : 1.00 (avg.} <br />Material consistency description : Job efficiency : 0.83 (lshilUday) <br />Loose stockpile Spoil pile : 0.80 (fnd-rfJ <br /> Push gradient : 1.52 (Cat Hl3) <br />Average push gradient : 25.00 °~ (nag) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,300 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 1.56 <br />Weight description <br />Top Soil Adjusted unit production : 695.01 LCY/hr <br /> Adjusted fleet production : 695.01 LCY/hr <br /> <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 13.00 Hours <br />Unit cost : $0.125 /LCY Total job cost : x1,127 <br />PermiUjob# : M-1992-016 <br />Abbreviation :none <br />Filename : M016-004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.