My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-28_REVISION - M1992016
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992016
>
2003-05-28_REVISION - M1992016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:36:01 PM
Creation date
11/21/2007 8:29:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992016
IBM Index Class Name
Revision
Doc Date
5/28/2003
Doc Name
Amendment Approval
From
DMG
To
Rocky Mountain Materials & Asphalt Inc
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Caoacitv <br />Basis <br />Scraper Bowl (volume) Basis <br />Material weight: 2,650 poundslLCY <br />Material description <br />Decomposed rock - 25% Rock, 75% Earth <br />Rated payload : 55,000 pounds <br />Payload capacity : 20.75 LCY <br />Cycle Time <br />Scraper loading time' : 0.90 <br />Maneuver and spread time : 0.70 <br />• load time per scraper pair on push-pull models <br />Struck volume : 18.00 LCY <br />Heaped volume : 23.00 LCY <br />Average volume : 20.50 LCY <br />Adjusted capacity : 20.50 LCY *" <br />hourty production reflects volume per scraper pair on push-pull motlels <br /> ob Condition Corrections : Site altitude (ft.) : 5,300 <br /> Scraper Push dozer Source <br />minutes Altitude adj.: 1.000 NA (Cat HB) <br />minutes Job efficiency : 0.830 NA (Cat HB) <br /> Net wrrection : 0.830 NA <br />Travel time <br />Road condition description :Rutted dirt little maintenance, no water, 2"tire <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (°!o) Velocity (fpm) Travel time (min.)" <br />1 1,000 0.50 5.00 5.50 1098 0.98 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.98 minutes <br />Retum route <br />table veloUties are max. attainable per total resistance drown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 3.20 <br />Unadjusted unit production/hour : 384.46 LCY/hour "' Adjusted for job conditions : 319.10 <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 1 <br />Adjusted single scraper team (unit) hourly production : 319.10 <br />Adjusted multiple scraper team (fleet) hourly production : 319.10 <br />minutes <br />minutes <br />LCY/hour <br />scraper(s) <br />LCY/hour <br />LCY/hour <br />"travel time far each segment is adjusted for acceleredon/deceleretion. Return time : 0.62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.