Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />Agency or organization name :DMG <br />Task # : 007 State :Colorado <br />Date : 0521/2003 <br />User: JD1 <br />Site :Penrose Ranch Pit <br />PermiUjob # : M-1992-01 ti <br />Abbreviation :none <br />Filename : M016-007 <br />Permit or other job action :Phased Reclamation - 100 Acres <br />Task description :place topsoil in disturbed area - 50 acres <br />County :Fremont <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Scraper work team -Scraper:Cat623G <br />-Push dozer:NA <br />Cost Bre <br />-uump area •rvH <br />Road maintenance -Motor grader :NA <br />-Water truck :NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip cosUhour : $48.31 NA NA NA NA NA <br />Operating cosUhour : $82.98 NA NA NA NA NA <br />Ripper op.cosUhour: NA NA NA NA NA NA <br />OperatorcosUhour: $25.43 NA NA NA NA NA <br />Unit subtotals • $156.72 NA NA NA NA NA <br />Numbar of units : 1 0 0 0 0 0 <br />Group subtotals : Work : $156.72 Support : $0.00 Maintenance : $0.00 <br />Total work team cosUhour : $156.72 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 80,667 CCY factor: 1.215 <br />Source of quantity take-off :calculation <br />Source of estimated swell factor :program <br />volume: 98,010 LCY <br /> <br />