My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-28_REVISION - M1992016
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992016
>
2003-05-28_REVISION - M1992016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:36:01 PM
Creation date
11/21/2007 8:29:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992016
IBM Index Class Name
Revision
Doc Date
5/28/2003
Doc Name
Amendment Approval
From
DMG
To
Rocky Mountain Materials & Asphalt Inc
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Haulino Caoacity: <br />Scraper Payload (weight) Basis : I Scraper Bowl (volume) Basis <br />Material weight : 2,650 pounds/LCY <br />Material description <br />Decomposed rock - 25% Rock, 75% Earth <br />Rated payload : 55,000 pounds <br />Payload capacity : 20.75 LCY <br />Struck volume : 18.00 LCY <br />Heaped volume : 23.00 LCY <br />Average volume : 20.50 LCY <br />Adjusted capacity : 20.50 LCY "' <br />twurfy production reilegs volume per scraper pair on push-pull models <br />Cvcle Time : ob Condition Corrections : Site altitude (ft.) : 5,300 <br /> Scraper Push dozer Source <br />Scraper loading time' : 0.90 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.70 minutes Job efficiency . 0.830 NA (Cat HB) <br />• load time per scraper pair on push-pull models Net COfreCtion : 0.830 NA <br />Travel time <br />Road condition description :Rutted dirt, little maintenance, no water, 2" fire penetration <br />Haul Route <br />Seg. # Haui distance (feet) Grade (%) Roll. res. (°fo) Total res. (%) Velocity (fpm) Travel time (min.)"' <br />1 1,000 0.50 5.00 5.50 1098 0.98 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.98 minutes <br />Return route <br />minutes <br />table velodties are maz. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 3.20 <br />Unadjusted unit productionihour : 384.46 LCY/hour "' Adjusted for job conditions : 319.10 <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 1 <br />Adjusted single scraper team (unit) hourly production : 319.10 <br />Adjusted multiple scraper team (fleet) houdy production : 319.10 <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) <br />Unit cost: x0.491 /LCY <br />Total job time <br />Total job cost <br />170.60 <br />minutes <br />LCY/hour <br />scraper(s) <br />LCY/hour <br />LCY/hour <br />Hours <br />•• navel time for each segment is adjusted for aaelemtion/deceleration. RetUm time : 0.62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.