Laserfiche WebLink
7.0 EXHIBIT F -RECLAMATION PLAN MAP <br />The post-mining site plan for reclamation of the property is illustrated on Exhibit F.1. <br />Exhibits F.3 and F.4 aze contained in the current permit (2000 amendment). Typical <br />sections of the wetlands and ponds are shown on Exhibit F.3. Typical details of the <br />flow control structures, including check dams, channels and spillways, aze shown on <br />Exhibit F.4. These details aze provided to illustrate the general construction of these <br />structures only. These structures will be sized to pass surface runoff from the 25-yeaz <br />storm event plus the groundwater base flow. <br />aizsrzooa <br />