My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-01-31_REVISION - M1986015 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986015
>
2007-01-31_REVISION - M1986015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:42:30 PM
Creation date
11/21/2007 8:25:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
Revision
Doc Date
1/31/2007
Doc Name
Amendment
From
Continental Materials Corporation
To
DRMS
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN <br />Phase 1 MINING PLAN REQUIREMENTS (CHANGES FROM ORIGINAL PLAN) - <br />Requirement: Phase 1 will remain basically as originally designed with respect to the area of <br />mining and the direction of mining. However, the slurry wall installation a[ the end of Phase 1 <br />has been deleted from this plan. (No discussion associated with this requirement) <br />Requirement: Phase 1 will be backfilled using a series of sediment basins. Wash fines in <br />combination with overburden and soil shall be used [o backfill Phase 1. (See Page 21) <br />Regubement: The actual arrangement of sediment basins may vary at the discretion of the <br />operator so long as all basins have at leas[ one side with an unsealed connection to adjacent <br />unmined land and a significant portion of the groundwater is allowed to Flow completely <br />through the backfilled area. (No discussion associated with this requirement) <br />Phase 2 MINING REQUIREMENTS - <br />STEP 1: Streambank Strengthening and Protection Issues <br />Requrrem ent: Prior to mining Phase 2, Streambank strengthening and stabilization shall be <br />installed along the river bank south of Phase 2 at all locations where it is expected that <br />erosion may occur. The preference will be for the installation of closely spaced (20 fee[ or <br />so) jetties keyed into the bank antl extending a short ways into the river flow. Prior to <br />installation approval from [he U.S. Army Corps of Engineers may be required. <br />(See Page 22) <br />Requirement: As an additional precaution, the southern side of the pit will not be mined <br />within 300 feet of [he river until any Streambank stabilization on the river bank has <br />developed to a point where it can protect the bank from undercutting. For the firs[ two or <br />three years of the operation in Phase 2, mining will stay north of that 300 foot setback. (No <br />discussion associated with this requirement) <br />Requirement: A temporary overflow protection berm will be constructed along the south <br />edge of the affected land. This berm may require FEMA approval prior to construction. <br />(See Page 24) <br />Pueblo East Pit Amendment 3 (2007) Exhibit D Page 4 of 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.