Laserfiche WebLink
Stip k Description Status <br /> 27 TCC must perform constant monitoring of Future <br /> all inflow or seepage encountered as the <br /> lst,2nd, and 3rd left gate roads are <br /> advanced.TCC must report any encountered <br /> measurable inflows to the Division immediately, <br /> and shall keep the Division appraised of any <br /> changes of inflow. Monitoring of inflows <br /> shall continue until the Division approves cessation. <br /> 28 In the event that total accumulated inflow Future <br /> from the gate road extensions were to reach or <br /> exceed 50 gallons per minute, TCC will cease <br /> further mining and seal the areas of inflow, <br /> until installation of the alluvial wells and <br /> stream gages is completed and initial <br /> monitoring accomplished. In the event that <br /> installation of seals becomes necessary, TCC <br /> shall inform the Division of its proposed <br /> methodology in order to obtain approval before <br /> commencing the installation of the monitoring <br /> facilities , TCC must obtain approval from the <br /> Division prior to resuming gateroad extension. <br /> 29 TCC will submit proposed locations and Future <br /> descriptions of the alluvial wells and stream <br /> gaging stations to be installed, and a schedule <br /> for their installation, to the Division for <br /> approval within two weeks after approval of <br /> MR-91-69. <br /> Commitments <br /> 1 Subsidence monitoring report Active/ <br /> Up-to-date on <br /> compliance <br /> 2 Sagegrouse LEK monitoring of Forgiven <br /> Hudspeth Complex 4/7/88 <br /> 3 Hydro Monitoring Date Terminated <br /> 2/l /90 <br /> -3- <br />