Laserfiche WebLink
yC <br />T <br />'. � I � !� � 1 'i 1 •' � Ii9i ` ,f i J i, ', yr ka <br />• t � Ij i , 6 � R��j� `S � '� <br />0 <br />if t <br />{I <br />t 12 <br />°t'ef� at1t z W <br />100YR FLOODWAY _.. - - O <br />REMOVE COLLECTION -I a '` <br />SIDE ACCESS ' <br />TRENCH & REPLACE 18" CULVERT <br />€ i ROAD I u OUTLET <br />Q co WITH FRENCH DRAIN & GATE <br />;y3 2 t WATERS OF U.S. <br />4820 ` �' ,;\Y <br />: BOX / <br />� DITCH <br />l k _ <br />N. <br />I <br />SCREENING BERM __ -- <br />1 iit� '�;� , ,•� � <br />3H:1 V RECLAIMED SLOPE / r <br />►� s RESERVOIR LINER RE- ROUTED <br />Ip 3� BOX ELDER <br />' � DITCH <br />1 I <br />i� Qi Ll PERMIT <br />BOUNDARY <br />� 9 I <br />z <br />I� O l <br />Z <br />QD <br />0 0 <br />LLI <br />i <br />J. <br />t itl o Z� <br />0 cc <br />t !' 9 18" CULVERT <br />& GATE <br />TOP OF LEVEE <br />1 = r 4834 <br />-40. ," a I <br />! Of <br />0 I <br />i o 3H:1 V RESERVOIR <br />RECHARGE POND ° � LINER I <br />w 00 <br />• �! .. § .. 1 p 14 I <br />p � 482 <br />.,: -•=== '— -� f • • , • RECHARGE POND <br />'_ ••• ''' _ •• .•• SE CORNER <br />-- ..--�- — • r <br />� - ^` °e r..���,,,i. 1 �/ ! 1; i . f i" 1i•• �x � . — —.. . -. �.. °" . ,.r a ���•,,,;,... _ ........... .. _ .'.'°`,+cs...:.- -- �:�..- — -_ — -.. .. _ --�'. :- •,c-,...e.....,.Wr::...:..- -- . <br />- <br />_ — R ETO EXISTING DCUULVERT <br />RECHARGE POND OUTLETS <br />- = f - ` }�, `�• � i �. � <br />(LARIMER COUNTY) <br />TO EXISTING DRAIN COUNTY ROAD 36 <br />j I r3t i9W <br />SEEDING <br />THINSPIKE WHEATGRASS (CRITANA) <br />SIDE -OATS GRAMMA (VAUGHN) <br />SWITCHGRASS (NEBR. 28) <br />SCARIFIED PRIOR TO THE <br />PLACEMENT OF FILL MATERIALS. <br />ALL WEATHERED BEDROCK TO <br />BE EXCAVATED AND REMOVED <br />FROM THE FOUNDATION. <br />WEATHERED BEDROCK SHALL <br />BE REMOVED UNTIL COMPETENT <br />BEDROCK (AS DETERMINED BY <br />THE ONSITE ENGINEER) IS <br />EXPOSED. <br />ELEV. =4825 <br />LEGEND: <br />EXISTING CONTOURS <br />-- - - EXISTING FLOWLINE <br />- - EXISTING FENCELINE <br />EXISTING PAVED ROADS <br />EXISTING DIRT ROADS <br />EXISTING VEGETATION <br />EXISTING UTILITY POLE <br />— PROPERTY BOUNDARY <br />4820 PROPOSED CONTOURS <br />100 YEAR FLOODWAY <br />RE- ROUTED BOXELDER DITCH <br />PERMIT BOUNDARY <br />---- - - - - -- FRENCH DRAIN <br />LANDSCAPE NOTES: <br />51/2 #PLS /AC. <br />2Y2 #PLS /AC. <br />1V2 #PLS /AC <br />02 #PLS /AC. TOTAL <br />3' FREEBOARD <br />5.0' <br />SILTSTONE (MIN.) <br />BEDROCK <br />RESER <br />N.T.S. <br />1 <br />IR LINER/ <br />15.0' <br />COMPACTED <br />CLAY LINER <br />ROUNDWA' <br />EARTHWORK NOTES <br />1. Each layer of fill shall be scarified to allow <br />proper bonding between layers. <br />2. Density and moisture content testing shall <br />be done at a rate of 1 test for each <br />2000 yards placed. <br />3. All clay liner material shall be compacted <br />to a minimum 95% ASTM- D698 -78 Standard <br />Proctor at ±2% of optimum moisture content <br />EXISTING <br />GRADE <br />0 <br />J � l <br />L <br />e- <br />U, <br />0'. <br />RECLAMATION NOTES: <br />1. SEEDING WILL BE ACCOMPLISHED BY DRILLING. <br />2. PLANTING WILL OCCUR IN THE FALL OR SPRING. <br />3. BERMS WILL AVERAGE 4 TO 5 FEET IN HEIGHT AND <br />40 TO 70 FEET IN WIDTH AS SHOWN ON THE PLAN <br />4. LANDSCAPING ALONG SOUTH AND WEST BOUNDARIES <br />TO BE COMPLETED PRIOR TO PHASE 2 MINING. <br />0I�_ <br />z — <br />z M <br />51 .J <br />FRENCH <br />DRAIN <br />� O <br />r UNDISTURBED <br />SAND & GRAVEL <br />4. An 815 or 825 sheepsfoot roller will be <br />used for compacting efforts. <br />5. The clay liner material shall be mixed in <br />the embankment at the ratio of 4 parts <br />clay overburden (CL) to 1 part siltstone <br />bedrock. <br />6. The clay liner material shall be placed in <br />a 9" (max.) loose lift prior to compaction <br />12.0' <br />RECHARGE 3 COMPACTED - <br />POND 1 - -CLAY LINER <br />FLOODW <br />N.T.S. <br />10.0' <br />'DIVERSION B <br />1 <br />P- <br />Y <br />0 <br />� <br />cC <br />\ <br />4 <br />Y <br />J' 0 <br />1- <br />0 <br />r \[ <br />j O <br />1 " =200' <br />as <br />_ <br />a. U���wE <br />o <br />-off <br />L <br />e- <br />U, <br />0'. <br />RECLAMATION NOTES: <br />1. SEEDING WILL BE ACCOMPLISHED BY DRILLING. <br />2. PLANTING WILL OCCUR IN THE FALL OR SPRING. <br />3. BERMS WILL AVERAGE 4 TO 5 FEET IN HEIGHT AND <br />40 TO 70 FEET IN WIDTH AS SHOWN ON THE PLAN <br />4. LANDSCAPING ALONG SOUTH AND WEST BOUNDARIES <br />TO BE COMPLETED PRIOR TO PHASE 2 MINING. <br />0I�_ <br />z — <br />z M <br />51 .J <br />FRENCH <br />DRAIN <br />� O <br />r UNDISTURBED <br />SAND & GRAVEL <br />4. An 815 or 825 sheepsfoot roller will be <br />used for compacting efforts. <br />5. The clay liner material shall be mixed in <br />the embankment at the ratio of 4 parts <br />clay overburden (CL) to 1 part siltstone <br />bedrock. <br />6. The clay liner material shall be placed in <br />a 9" (max.) loose lift prior to compaction <br />12.0' <br />RECHARGE 3 COMPACTED - <br />POND 1 - -CLAY LINER <br />FLOODW <br />N.T.S. <br />10.0' <br />'DIVERSION B <br />1 <br />P- <br />_T <br />6.0' - 8.0' <br />7. All bedrock material shall be ripped, moisture <br />treated, and allowed to air slake for a min- <br />imum of 1 day prior to its placement in <br />the liner. All bedrock material shall have <br />a minimum of 75% passing the #200 sieve <br />prior to placement in the embankment. <br />8. All random fill to be placed with a maximum <br />9" loose lift and compacted to a minimum <br />of 95% ASTM - D698 -78 Standard Proctor. <br />3 <br />1 MINE <br />- BEDROCK SURFACE TO BE SCARIFIED <br />PRIOR TO THE PLACEMENT OF FILL MATERIALS. <br />ALL WEATHERED BEDROCK TO BE EXCAVATED <br />AND REMOVED FROM THE FOUNDATION. <br />WEATHERED BEDROCK SHALL BE REMOVED <br />UNTIL COMPETENT BEDROCK (AS DETERMINED <br />BY THE ONSITE ENGINEER) IS EXPOSED. <br />,ROSS SECTION <br />FLOODWAY DIVERSION BERM NOTES <br />1. Berm location and alignrrent may be shifted north as needed without floodway impact. <br />2. Berm elevation may be higher than indicated if extra overburden materials are available. <br />3. Berm width may be wide- than indicated without floodway impact if elevation is not above <br />existing ground to the aouth. <br />200 100 0 200 400 6010 <br />SCALE IN FEET <br />~ 3S73S m <br />AUTHORIZED SIGNATUREONA <br />DATE <br />Q <br />J <br />V <br />W <br />cc <br />(i <br />Z <br />� a <br />W J <br />V W <br />Z <br />Z <br />0 0 <br />U v <br />W <br />oc = <br />a <br />W Z <br />Z <br />Z — <br />0 <br />V <br />Drawn: <br />CJC MAK <br />Design: <br />KES WKS <br />Checked: <br />1- <br />0 <br />Scale: <br />1 " =200' <br />O <br />ui <br />� <br />N <br />Ln <br />o <br />C <br />tw <br />co <br />— <br />a <br />° <br />N <br />LO <br />y <br />3 <br />Y <br />3 <br />c <br />o <br />Q <br />CA <br />N <br />O <br />m <br />� <br />� 00 <br />O <br />U <br />¢ <br />"4 <br />111111• <br />oo <br />LLI <br />° <br />^N�0 <br />U <br />v <br />_�� <br />.. C) <br />�U�r-= <br />111111 <br />3 � ° <br />U <br />cC <br />� � <br />._• <br />3 <br />�n L2 <br />CE) <br />m <br />y <br />MEN <br />MEN <br />Z <br />Date: <br />Q <br />Ja <br />CL <br />=U <br />z <br />0 <br />C <br />0 <br />U <br />) <br />N <br />Q <br />Z <br />• <br />_T <br />6.0' - 8.0' <br />7. All bedrock material shall be ripped, moisture <br />treated, and allowed to air slake for a min- <br />imum of 1 day prior to its placement in <br />the liner. All bedrock material shall have <br />a minimum of 75% passing the #200 sieve <br />prior to placement in the embankment. <br />8. All random fill to be placed with a maximum <br />9" loose lift and compacted to a minimum <br />of 95% ASTM - D698 -78 Standard Proctor. <br />3 <br />1 MINE <br />- BEDROCK SURFACE TO BE SCARIFIED <br />PRIOR TO THE PLACEMENT OF FILL MATERIALS. <br />ALL WEATHERED BEDROCK TO BE EXCAVATED <br />AND REMOVED FROM THE FOUNDATION. <br />WEATHERED BEDROCK SHALL BE REMOVED <br />UNTIL COMPETENT BEDROCK (AS DETERMINED <br />BY THE ONSITE ENGINEER) IS EXPOSED. <br />,ROSS SECTION <br />FLOODWAY DIVERSION BERM NOTES <br />1. Berm location and alignrrent may be shifted north as needed without floodway impact. <br />2. Berm elevation may be higher than indicated if extra overburden materials are available. <br />3. Berm width may be wide- than indicated without floodway impact if elevation is not above <br />existing ground to the aouth. <br />200 100 0 200 400 6010 <br />SCALE IN FEET <br />~ 3S73S m <br />AUTHORIZED SIGNATUREONA <br />DATE <br />Q <br />J <br />V <br />W <br />cc <br />(i <br />Z <br />� a <br />W J <br />V W <br />Z <br />Z <br />0 0 <br />U v <br />W <br />oc = <br />a <br />W Z <br />Z <br />Z — <br />0 <br />V <br />Job No: 02 -191 <br />Drawn: <br />CJC MAK <br />Design: <br />KES WKS <br />Checked: <br />Scale: <br />1 " =200' <br />111111• <br />111111 <br />MEN <br />MEN <br />Date: <br />02/14/07 <br />Job No: 02 -191 <br />Drawn: <br />CJC MAK <br />Design: <br />KES WKS <br />Checked: <br />Scale: <br />1 " =200' <br />Sheet: <br />Of: <br />