Laserfiche WebLink
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />7313 Sherman Street, Room 878 <br />Denver, Colorado 80203 <br />Phone (303) 866-3587 Res onse to Reclamation Permit A lication Conside <br />OF CO <br />/~~ ~ <br />~ r <br />tie0o\ <br />a/r~J,i <br />1876 ~` <br />FAX (303)866-3589 p pp 'Ft7L~CEIVED / <br />t,/ Bill Owens <br />www.watecstate.m.us Governor <br />DATE: June 16, 2004 JUN ~ ~ 2U04 Russell Ceorge <br />Executive DirecTOr <br />TO: /t~,. Russell Means, Environmental Protection Specialist piuision of Minerals and Geolagy sat DE girieern, RE. <br />CC: Division 5 Office; District 39 WWJater Commissioner ~ ,py / <br />FROM: /Craig M. Lis, P.E. ~~~~'~ / ~ /i <br />RE: Operator: United Compa~ of Mesa County, Chambers Pit, File No. M-79-/205 <br />Section 11, Twp 6 S, Rng 93 W, 6th P.M., Garfield County <br />Landowner- Donald Scott, Colorado Rivers Edge LLC, Rocks R Us LLC <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />® The proposed operation will consume ground water by ®evaporation, ®dust control, ®reclamation, ®water <br />removed in the mined product, ®processing, ®other: irrigation of wetland azeas, and processing at the cement <br />plant and asphalt plant, Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br />gravel pit or other type of well permit, as applicable, Prior to obtaining a permit, an approved water supply plan <br />or decreed plan for augmentation is required. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and document the <br />locations of all wells within 600 feet mile of the permit area, The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or contact this office regarding the <br />600 foot spacing notification/hearing process. <br /> <br />The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />The applicant has indicated plans to use other water for:_uses at the permit site, -storage in the excavated <br />azea(s). The applicant will need to provide evidence to this office that the water is permitted or decreed for such <br />uses. <br />Other: <br />COMMENTS: <br />