My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-11-10_REVISION - M1978056 (8)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978056
>
2003-11-10_REVISION - M1978056 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 10:25:11 AM
Creation date
11/21/2007 8:10:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978056
IBM Index Class Name
Revision
Doc Date
11/10/2003
Doc Name
Resubmittal of App and Exhs
From
Varra Companies Inc
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit L -Reclamation Costs <br />Simultaneously with the extraction of the remaining portions of Tracts A, B, and <br />C, will be the concurrent fill of Tract D, as iterated above. This will ultimately <br />liberate the 11.84± Acres allocated in the SSP for the existing basin at Tract D in <br />this manner: <br />- 4.14 Acres upon completion of Tract A -Planned Area of Extraction <br />- 2.37 Acres upon completion ofTract B -Planned Area of Extraction <br />6.51 Acres total reduction of exposed <br />fill of Tract D <br />Therefore, immediately prior to the extraction of Tract C -Planned Area of <br />Extraction, exposed surface acres of groundwater will be 109.08± acres, <br />determined as follows: <br />108.56± (above) <br />- 4.14± Acres - fill of Tract D RECEI!/Ef3 <br />104.42± Acres -balance <br />+ 7.00± Tract B NOV 10 2003 <br />111.42± Acres -balance <br />Division of Minerals and Grolagy <br />- 2.34± Acres -fill of Tract D <br />109.08± upon completion of Tract B <br />Prior to the completion of Tract C, additional water may be necessary, however, <br />the total projected water demand based upon expected elevation and extent of <br />exposed groundwater of the final basins is 128.40± acres + 7.00± acres, or a total <br />of 135.40± acres of potential exposed groundwater (refer to Exhibit F - <br />Reclamation Plan Map). Based upon the water available in the SSP of 125.08± <br />acres, is a difference of - 7.6± percent, very late in the operation. However, <br />approximately 92.4% of Area D will be backfilled as well, liberating nearly 10.94 <br />acres of the 11.84 acres once exposed, or a total of 136.02 acres of available <br />water. Therefore, the anticipated final area of exposed ground water of <br />135.40 acres is met under the combined SSP and revised Mining and Reclamation <br />Plans of this Amendment. Regardless, additional water is available in water shares <br />should the unlikely need arise. <br />Varra Companies, Inc. DMG Permit M78-056 2003 Amendment 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.