Laserfiche WebLink
Exhibit L -Reclamation Costs <br />Affected Lands (Refer to Exhibit C -Pre-Mining and Mining Plan Map: <br />The 229.89 Acres of lands comprising the permit boundary are as follows: <br />44.66± Unaffected (the balance of 185.23 acres are affected as described) <br />22.14± Affected Lands not otherwise described. <br />13.46± Acres of fill -Tract D <br />26.26± Acres Pond -Tract C <br />42.10± Acres Basin -Completed portion of Tract A RECEIVED <br />17.82± Acres of Active Extraction - Tract A NUV 102003 <br />20.1$± Acres of Planned Extraction -Tract A <br />2$.60± Acres of Planned Extraction - Tract C Oivisiun of Minerals and GeolaOY <br />11.61± Acres of Planned Extraction -Tract B <br />6.09± Acres of permanent roads <br />Perimeters AND Mean Depth (linear feet (l~) of calculated features are as <br />follows: <br />SLOPE: <br />3131.80± Tract DBasin - 25 ft. depth <br />6402.36± Tract CPond -1$ ft. depth <br />Linear Ft. per shoreline: North 2119.$8± below graded area <br />West 1689.7$± w/ 10' embankment <br />South 25$2.24± w/ 2$' embankment <br />East 40.79± shoreline at grad <br />from wash fines <br />800.00± Tract A Active Extraction - 2$ ft. depth of Advancing pit wall <br />RATE OF FILL -13.46± ACRES - TRACT D: <br />Fill will be derived from processing fines from remaining areas of extraction; <br />along with other inert fill. The percentage is a function of time to volume: <br />20.1$± Tract A = 3$% of total area of extraction remaining as percent of fill <br />11.61± Tract B = 20% of total area of extraction remaining as percent of fill <br />2$.60± Tract C = 4$% of total area of extraction remaining as percent of fill <br />$7.36± Total acres of extraction remaining. <br />Varra Companies, Inc. DMG Permit M78-0$6 2003 Amendment 3 <br />