Laserfiche WebLink
C <br />n <br />\I <br />1 <br />r <br />t <br />DFA 7 <br />Q100 = 482cfs ` <br />( KIOWA ENGINEERING) PROPOSED 110' <br />LONG x 130' % ` <br />WIDE SPILLWAY i \ <br />ELEV. 4975.0 ; <br />PROPOSED 60' NORTH LAKE <br />WIDE RUNDOWN (36 AC) \ <br />\Q <br />CHANNEL ' <br />�f <br />i <br />PROPOSED 5' 3 <br />WIDE RUNDOWN ,0. <br />CHANNEL '~t <br />2 ' <br />BANK i <br />------ - - - - -- -.DFA 6 <br />—a - -- � -4— -STAErtLTZATiO <br />FROM UDFCD Q100 = 58cfs -- <br />r- <br />( KIOWA ENGINEERING) /� �♦ <br />CARLSON ; j <br />' I EASEMENT; �' <br />/ 1 <br />♦� v' <br />' & <br />_ <br />-�'�ii <br />i <br />PROPOSED 110, ' ' <br />LONG x 300' I ; ' ; <br />\ <br />\ <br />r <br />i <br />\ <br />♦ <br />♦ <br />♦ <br />i <br />♦ <br />♦ <br />♦ <br />♦ <br />♦ <br />' T WIDE RUNDOWN APPROXIMATE <br />CHANNEL 10 -YR �<v 100 -YR <br />FLOIDDWAY FLOODWAY <br />' I <br />NORTHWEST I I RELOCATED <br />CORNER, PIPELINE TOP OF w <br />SECTION 23 I BANK , g <br />IN. 100' <br />------- <br />_ _ — <br />- - — - - — BERM' PROPOSED <br />LATERAL BERM, <br />DOWNSTREAM I <br />/ PROTECTION <br />EXISTING <br />LAKE <br />OIL' �' ♦i <br />DFA 4 / s RFACE TED <br />Q100 = 813cfs / I �♦ <br />( KIOWA ENGINEERING) <br />i 41 <br />SOUTH s t♦ <br />184.98 cc RESERVOIR <br />(77 AC) <br />I <br />/ PROPOSED 100' PROPOSED ' <br />BRANTNER WIDE RUNDOWN BANK I <br />IRRIGATION CHANNEL STABILIZATION ' ♦ PROPOSED 110' LONG <br />DITCH I ' I x 250' WIDE SPILLWAY <br />ELEV. 4986.5 APPROXIMATE <br />}'' • 100 -YR <br />FLOODPLAIN <br />BANK <br />STABILIZATION <br />i FROM UDFCD �' of s <br />tv� tK GOETZ I <br />EASEMENT ' <br />Pv \ - - -J - -- '23, ------- - - - - -- <br />--------- - - - - -- <br />EXISTING <br />1 j LAKE <br />1 � <br />I <br />1 � \ <br />PROPOSED <br />BANK i <br />STABILIZATION <br />' TOWER 1 % i LAKE 1 <br />\ EASEMENT <br />� r � <br />1 <br />♦ , <br />\\ \\ \1 <br />PIT SIDE <br />DOWNSTREAM ' TYP. 100' UPSTREAM <br />PIT NORMAL MINIMUM, <br />WATER SURFACE 3 <br />VEGETATED <br />r <br />I 3 �. <br />TYPE L <br />RIPRAP <br />7 1 3 2.0 X <br />1 2 D50 <br />800 t200 6" TYPE II GRANULAR <br />BEDDING AND FILTER <br />LATERAL BERM PROTECTION DETAIL <br />NTS <br />100' <br />UDFCD <br />SETBACK <br />6" TYPE II GRANULAR <br />BEDDING AND FILTER <br />RIVERSIDE <br />1.75 X 1.00' <br />1 D50 <br />2 -YR WATER SURFACE <br />3.0 X 3.00' <br />50 RIVER MIN. <br />RIVER INVERT <br />5.00' 1 <br />MIN. <br />TYPE L 1.00' <br />RIPRAP MIN. <br />TYPICAL RIVERSIDE PROTECTION DETAIL <br />18" (MIN.) <br />GROUTED <br />BOULDERS <br />PIT INVERT <br />100' SETBACK OPTION <br />NTS <br />PIT SIDE <br />15.00' <br />3 <br />,10 <br />3.00' <br />MAINTENANCE TOP OF RIVERSIDE BERM <br />ACCESS TRAIL <br />1 <br />0.00' <br />1 <br />PIT SIDE <br />200' <br />UDFCD <br />SETBACK <br />VEGET <br />4 <br />1 <br />IL <br />WIDE <br />SPILLWAY <br />N <br />E <br />RIVERSIDE <br />5Q <br />0 <br />V <br />/ ELEV. <br />4978.0 <br />CC <br />O <br />� <br />W <br />1,1 <br />O <br />� <br />Aoib� v <br />U <br />o <br />♦ <br />♦ <br />N <br />N <br />g00 <br />Urn`0 <br />Z <br />C <br />w <br />t, <br />❑ <br />,yO� V � it <br />o <br />ry <br />3.00' <br />APPROXIMATE <br />t <br />_ C <br />W a <br />0 3 <br />\ <br />I <br />, <br />, <br />Ql ♦ <br />0 <br />100 -YR <br />FLOODPLAIN <br />/ <br />100' <br />SlftBACK <br />2.5 <br />0 <br />DFA 5 <br />Q <br />O <br />4 TYP.) <br />! <br />4�4y�i <br />,�. <br />am <br />CENTRAL <br />a <br />S <br />Q <br />Q100 = 304cfs <br />U <br />RESERVOIR <br />I <br />TOWER - B <br />( KIOWA ENGINEERING) <br />'p <br />a <br />j <br />(83 AC) <br />EASEMENT <br />j <br />i <br />0 <br />o <br />I <br />PROPOSED 40' <br />I <br />, <br />\ <br />\ <br />r <br />i <br />\ <br />♦ <br />♦ <br />♦ <br />i <br />♦ <br />♦ <br />♦ <br />♦ <br />♦ <br />' T WIDE RUNDOWN APPROXIMATE <br />CHANNEL 10 -YR �<v 100 -YR <br />FLOIDDWAY FLOODWAY <br />' I <br />NORTHWEST I I RELOCATED <br />CORNER, PIPELINE TOP OF w <br />SECTION 23 I BANK , g <br />IN. 100' <br />------- <br />_ _ — <br />- - — - - — BERM' PROPOSED <br />LATERAL BERM, <br />DOWNSTREAM I <br />/ PROTECTION <br />EXISTING <br />LAKE <br />OIL' �' ♦i <br />DFA 4 / s RFACE TED <br />Q100 = 813cfs / I �♦ <br />( KIOWA ENGINEERING) <br />i 41 <br />SOUTH s t♦ <br />184.98 cc RESERVOIR <br />(77 AC) <br />I <br />/ PROPOSED 100' PROPOSED ' <br />BRANTNER WIDE RUNDOWN BANK I <br />IRRIGATION CHANNEL STABILIZATION ' ♦ PROPOSED 110' LONG <br />DITCH I ' I x 250' WIDE SPILLWAY <br />ELEV. 4986.5 APPROXIMATE <br />}'' • 100 -YR <br />FLOODPLAIN <br />BANK <br />STABILIZATION <br />i FROM UDFCD �' of s <br />tv� tK GOETZ I <br />EASEMENT ' <br />Pv \ - - -J - -- '23, ------- - - - - -- <br />--------- - - - - -- <br />EXISTING <br />1 j LAKE <br />1 � <br />I <br />1 � \ <br />PROPOSED <br />BANK i <br />STABILIZATION <br />' TOWER 1 % i LAKE 1 <br />\ EASEMENT <br />� r � <br />1 <br />♦ , <br />\\ \\ \1 <br />PIT SIDE <br />DOWNSTREAM ' TYP. 100' UPSTREAM <br />PIT NORMAL MINIMUM, <br />WATER SURFACE 3 <br />VEGETATED <br />r <br />I 3 �. <br />TYPE L <br />RIPRAP <br />7 1 3 2.0 X <br />1 2 D50 <br />800 t200 6" TYPE II GRANULAR <br />BEDDING AND FILTER <br />LATERAL BERM PROTECTION DETAIL <br />NTS <br />100' <br />UDFCD <br />SETBACK <br />6" TYPE II GRANULAR <br />BEDDING AND FILTER <br />RIVERSIDE <br />1.75 X 1.00' <br />1 D50 <br />2 -YR WATER SURFACE <br />3.0 X 3.00' <br />50 RIVER MIN. <br />RIVER INVERT <br />5.00' 1 <br />MIN. <br />TYPE L 1.00' <br />RIPRAP MIN. <br />TYPICAL RIVERSIDE PROTECTION DETAIL <br />18" (MIN.) <br />GROUTED <br />BOULDERS <br />PIT INVERT <br />100' SETBACK OPTION <br />NTS <br />PIT SIDE <br />15.00' <br />3 <br />,10 <br />3.00' <br />MAINTENANCE TOP OF RIVERSIDE BERM <br />ACCESS TRAIL <br />1 <br />0.00' <br />1 <br />PIT SIDE <br />200' <br />UDFCD <br />SETBACK <br />VEGET <br />4 <br />1 <br />RIVER INVERT 1 W r <br />0 <br />0 <br />Q �I <br />> ai <br />J °' <br />..¢zo <br />TYPICAL RIVERSIDE PROTECTION DETAIL W o 0 <br />200' SETBACK OPTION <br />NTS <br />CONCRETE RIVERSIDE <br />CUTOFF WALLS, <br />4000 psi <br />1.75 X <br />650 <br />5 -YR FLOOD ELEVATION <br />2 -YR FLOOD ELEVATION <br />LiVLGtIAItU� � � 4 � \ <br />3.00' <br />100' MAX. <br />3.0 X � <br />TYPE M RIPRAP D50 <br />6" TYPE II GRANULAR <br />BEDDING AND FILTER <br />TYPICAL SIDE- CHANNEL <br />SPILLWAY CROSS SECTION <br />NTS <br />CONSTANT SPILLWAY <br />SIDE SLOPE <br />1 <br />VEGETATED <br />SIDE CHANNEL SPILLWAY <br />CENTER CROSS SECTION <br />EXISTING <br />GROUND <br />5.00' <br />3.00' <br />NTS <br />CONCRETE CUTOFF WALL <br />(4,000 psi) <br />18" (MIN.) <br />GROUTED <br />BOULDERS <br />PIT SIDE SLOPE <br />VVERT—L <br />3.00' <br />*TO BE CONSTRUCTED BY <br />FUTURE OPERATOR OF <br />RESERVOIR <br />2' DEEP, 3:1 SIDESLOPES <br />TYPICAL RUNDOWN CHANNEL for OFFSITE FLOWS <br />NTS <br />ADDITIONAL NOTES: <br />1, RECONSTRUCTED DRAWING FROM ORIGINAL BANKS AND 4. RUNDOWN CHANNEL LOCATIONS ARE APPROXIMATED <br />GESSO DRAWING, 3/21/2000 ACCORDING TO STUDY DONE BY KIOWA ENGINEERING. <br />LOCATIONS MAY VARY DEPENDING ON WHERE OFFSITE <br />2. EASEMENT BOUNDARIES OBTAINED FROM FILES PROVIDED BY FLOWS ARE ROUTED. <br />UDFCD. BOUNDARIES LOCATED WITH AS MUCH ACCURACY <br />AS POSSIBLE WITH INFORMATION GIVEN. 5. ALL PROTECTED AREAS MAY CONTAIN RIPRAP WITH <br />VEGETATION ABOVE THE ORDINARY HIGH WATER LINE IN <br />3. MINIMUM SETBACKS ARE SHOWN ASSUMING FULL RIVERSIDE ACCORDANCE WITH SECTION 2.3.2 OF UDFCD GRAVEL <br />BANK PROTECTION. IF RIVERSIDE BANK PROTECTION IS NOT MINING TECHNICAL GUIDELINES, 1987. <br />CONSTRUCTED, MINIMUM SETBACKS WILL BE 300'. <br />1 5.00' <br />ACCESS TRAIL <br />SCA <br />NOTE: / <br />POTENTIAL WETLAND AREAS ARE FROM IRRIGATION <br />O1 <br />TAILWATERS. IRRIGATION WATER WILL BE CUT OFF <br />AND THESE AREAS WILL DRY OUT. <br />O2 UNDISTURBED WETLAND AREAS <br />LEGEND <br />PERMIT AMENDMENT BOUNDARY <br />— - - — - - — SECTION LINE <br />SHORE LINE <br />TOPO CONTOUR <br />ROAD PAVED <br />------------ <br />___ ROAD UNPAVED <br />E -470 ALIGNMENT <br />RIVER <br />DITCH <br />—P —P — UNDERGROUND PIPE LINE <br />CLAY LINED AREAS <br />SLURRY WALL <br />WETLAND /WILDLIFE HABITAT <br />WATER STORAGE RESERVOIR <br />NATIVE GRASS & SHRUBS <br />NATIVE TREES AND BRUSH <br />UNDISTURBED VEGETATION <br />•------------- - - - - -• EXISTING EASEMENTS <br />100 -YR FLOODPLAIN <br />100 -YR FLOODWAY <br />RECEIVED <br />PAR 2 2 2002 <br />Jivision of Minerals and Geology <br />cc dU��� <br />IL <br />O <br />O � <br />N <br />E <br />RIVERSIDE <br />5Q <br />V <br />O <br />CC <br />O <br />� <br />W <br />1,1 <br />O <br />� <br />Aoib� v <br />U <br />o <br />m <br />N <br />N <br />g00 <br />Urn`0 <br />Z <br />C <br />w <br />t, <br />❑ <br />,yO� V � it <br />o <br />ry <br />3.00' <br />aa) <br />t <br />_ C <br />W a <br />0 3 <br />0 <br />N <br />� <br />MIN. <br />0 <br />O r <br />0 <br />= <br />2.5 <br />0 <br />° <br />Q <br />O <br />� <br />0 <br />a <br />m <br />,�. <br />am <br />o <br />N <br />a <br />S <br />Q <br />U <br />'p <br />a <br />j <br />a <br />N N <br />0 <br />o <br />N <br />W <br />_ <br />N 00D N <br />E <br />N M <br />tt <br />La <br />> <br />v <br />0 <br />n <br />v c <br />U <br />qT <br />RIVER INVERT 1 W r <br />0 <br />0 <br />Q �I <br />> ai <br />J °' <br />..¢zo <br />TYPICAL RIVERSIDE PROTECTION DETAIL W o 0 <br />200' SETBACK OPTION <br />NTS <br />CONCRETE RIVERSIDE <br />CUTOFF WALLS, <br />4000 psi <br />1.75 X <br />650 <br />5 -YR FLOOD ELEVATION <br />2 -YR FLOOD ELEVATION <br />LiVLGtIAItU� � � 4 � \ <br />3.00' <br />100' MAX. <br />3.0 X � <br />TYPE M RIPRAP D50 <br />6" TYPE II GRANULAR <br />BEDDING AND FILTER <br />TYPICAL SIDE- CHANNEL <br />SPILLWAY CROSS SECTION <br />NTS <br />CONSTANT SPILLWAY <br />SIDE SLOPE <br />1 <br />VEGETATED <br />SIDE CHANNEL SPILLWAY <br />CENTER CROSS SECTION <br />EXISTING <br />GROUND <br />5.00' <br />3.00' <br />NTS <br />CONCRETE CUTOFF WALL <br />(4,000 psi) <br />18" (MIN.) <br />GROUTED <br />BOULDERS <br />PIT SIDE SLOPE <br />VVERT—L <br />3.00' <br />*TO BE CONSTRUCTED BY <br />FUTURE OPERATOR OF <br />RESERVOIR <br />2' DEEP, 3:1 SIDESLOPES <br />TYPICAL RUNDOWN CHANNEL for OFFSITE FLOWS <br />NTS <br />ADDITIONAL NOTES: <br />1, RECONSTRUCTED DRAWING FROM ORIGINAL BANKS AND 4. RUNDOWN CHANNEL LOCATIONS ARE APPROXIMATED <br />GESSO DRAWING, 3/21/2000 ACCORDING TO STUDY DONE BY KIOWA ENGINEERING. <br />LOCATIONS MAY VARY DEPENDING ON WHERE OFFSITE <br />2. EASEMENT BOUNDARIES OBTAINED FROM FILES PROVIDED BY FLOWS ARE ROUTED. <br />UDFCD. BOUNDARIES LOCATED WITH AS MUCH ACCURACY <br />AS POSSIBLE WITH INFORMATION GIVEN. 5. ALL PROTECTED AREAS MAY CONTAIN RIPRAP WITH <br />VEGETATION ABOVE THE ORDINARY HIGH WATER LINE IN <br />3. MINIMUM SETBACKS ARE SHOWN ASSUMING FULL RIVERSIDE ACCORDANCE WITH SECTION 2.3.2 OF UDFCD GRAVEL <br />BANK PROTECTION. IF RIVERSIDE BANK PROTECTION IS NOT MINING TECHNICAL GUIDELINES, 1987. <br />CONSTRUCTED, MINIMUM SETBACKS WILL BE 300'. <br />1 5.00' <br />ACCESS TRAIL <br />SCA <br />NOTE: / <br />POTENTIAL WETLAND AREAS ARE FROM IRRIGATION <br />O1 <br />TAILWATERS. IRRIGATION WATER WILL BE CUT OFF <br />AND THESE AREAS WILL DRY OUT. <br />O2 UNDISTURBED WETLAND AREAS <br />LEGEND <br />PERMIT AMENDMENT BOUNDARY <br />— - - — - - — SECTION LINE <br />SHORE LINE <br />TOPO CONTOUR <br />ROAD PAVED <br />------------ <br />___ ROAD UNPAVED <br />E -470 ALIGNMENT <br />RIVER <br />DITCH <br />—P —P — UNDERGROUND PIPE LINE <br />CLAY LINED AREAS <br />SLURRY WALL <br />WETLAND /WILDLIFE HABITAT <br />WATER STORAGE RESERVOIR <br />NATIVE GRASS & SHRUBS <br />NATIVE TREES AND BRUSH <br />UNDISTURBED VEGETATION <br />•------------- - - - - -• EXISTING EASEMENTS <br />100 -YR FLOODPLAIN <br />100 -YR FLOODWAY <br />RECEIVED <br />PAR 2 2 2002 <br />Jivision of Minerals and Geology <br />cc dU��� <br />IL <br />O <br />RIVERSIDE <br />5Q <br />O <br />CC <br />O <br />m� VI <br />W <br />O <br />Q <br />O <br />J <br />m <br />N <br />N <br />2 -YR WATER SURFACE <br />Z <br />J <br />u <br />.9 <br />a <br />o <br />3.00' <br />aa) <br />F <br />U F <br />� <br />MIN. <br />0 <br />m <br />ca <br />2.5 <br />0 <br />x <br />Q <br />CL <br />U, E <br />ro <br />RIVER INVERT 1 W r <br />0 <br />0 <br />Q �I <br />> ai <br />J °' <br />..¢zo <br />TYPICAL RIVERSIDE PROTECTION DETAIL W o 0 <br />200' SETBACK OPTION <br />NTS <br />CONCRETE RIVERSIDE <br />CUTOFF WALLS, <br />4000 psi <br />1.75 X <br />650 <br />5 -YR FLOOD ELEVATION <br />2 -YR FLOOD ELEVATION <br />LiVLGtIAItU� � � 4 � \ <br />3.00' <br />100' MAX. <br />3.0 X � <br />TYPE M RIPRAP D50 <br />6" TYPE II GRANULAR <br />BEDDING AND FILTER <br />TYPICAL SIDE- CHANNEL <br />SPILLWAY CROSS SECTION <br />NTS <br />CONSTANT SPILLWAY <br />SIDE SLOPE <br />1 <br />VEGETATED <br />SIDE CHANNEL SPILLWAY <br />CENTER CROSS SECTION <br />EXISTING <br />GROUND <br />5.00' <br />3.00' <br />NTS <br />CONCRETE CUTOFF WALL <br />(4,000 psi) <br />18" (MIN.) <br />GROUTED <br />BOULDERS <br />PIT SIDE SLOPE <br />VVERT—L <br />3.00' <br />*TO BE CONSTRUCTED BY <br />FUTURE OPERATOR OF <br />RESERVOIR <br />2' DEEP, 3:1 SIDESLOPES <br />TYPICAL RUNDOWN CHANNEL for OFFSITE FLOWS <br />NTS <br />ADDITIONAL NOTES: <br />1, RECONSTRUCTED DRAWING FROM ORIGINAL BANKS AND 4. RUNDOWN CHANNEL LOCATIONS ARE APPROXIMATED <br />GESSO DRAWING, 3/21/2000 ACCORDING TO STUDY DONE BY KIOWA ENGINEERING. <br />LOCATIONS MAY VARY DEPENDING ON WHERE OFFSITE <br />2. EASEMENT BOUNDARIES OBTAINED FROM FILES PROVIDED BY FLOWS ARE ROUTED. <br />UDFCD. BOUNDARIES LOCATED WITH AS MUCH ACCURACY <br />AS POSSIBLE WITH INFORMATION GIVEN. 5. ALL PROTECTED AREAS MAY CONTAIN RIPRAP WITH <br />VEGETATION ABOVE THE ORDINARY HIGH WATER LINE IN <br />3. MINIMUM SETBACKS ARE SHOWN ASSUMING FULL RIVERSIDE ACCORDANCE WITH SECTION 2.3.2 OF UDFCD GRAVEL <br />BANK PROTECTION. IF RIVERSIDE BANK PROTECTION IS NOT MINING TECHNICAL GUIDELINES, 1987. <br />CONSTRUCTED, MINIMUM SETBACKS WILL BE 300'. <br />1 5.00' <br />ACCESS TRAIL <br />SCA <br />NOTE: / <br />POTENTIAL WETLAND AREAS ARE FROM IRRIGATION <br />O1 <br />TAILWATERS. IRRIGATION WATER WILL BE CUT OFF <br />AND THESE AREAS WILL DRY OUT. <br />O2 UNDISTURBED WETLAND AREAS <br />LEGEND <br />PERMIT AMENDMENT BOUNDARY <br />— - - — - - — SECTION LINE <br />SHORE LINE <br />TOPO CONTOUR <br />ROAD PAVED <br />------------ <br />___ ROAD UNPAVED <br />E -470 ALIGNMENT <br />RIVER <br />DITCH <br />—P —P — UNDERGROUND PIPE LINE <br />CLAY LINED AREAS <br />SLURRY WALL <br />WETLAND /WILDLIFE HABITAT <br />WATER STORAGE RESERVOIR <br />NATIVE GRASS & SHRUBS <br />NATIVE TREES AND BRUSH <br />UNDISTURBED VEGETATION <br />•------------- - - - - -• EXISTING EASEMENTS <br />100 -YR FLOODPLAIN <br />100 -YR FLOODWAY <br />RECEIVED <br />PAR 2 2 2002 <br />Jivision of Minerals and Geology <br />cc dU��� <br />Dato: <br />Job No: <br />Drawn: <br />Design: <br />Chocked: <br />Scalc: <br />Sheet: <br />Of: <br />z <br />0 <br />CL <br />CL <br />0 <br />U <br />N <br />w <br />0 <br />Z <br />n <br />a <br />0 <br />z <br />i/28/01 <br />01 -202 <br />O <br />o <br />W <br />O <br />CC <br />O <br />D <br />W <br />O <br />Q <br />O <br />J <br />V <br />Z <br />a <br />o <br />� <br />V <br />O <br />ca <br />V <br />/0 <br />V <br />Q <br />0 <br />a <br />m <br />Dato: <br />Job No: <br />Drawn: <br />Design: <br />Chocked: <br />Scalc: <br />Sheet: <br />Of: <br />z <br />0 <br />CL <br />CL <br />0 <br />U <br />N <br />w <br />0 <br />Z <br />n <br />a <br />0 <br />z <br />i/28/01 <br />01 -202 <br />