Laserfiche WebLink
EXHIBIT D Reclamation Plan <br />Upon completion of the excavation, the newly affected portion of the pit walls will be sloped at a 3:1 or <br />flatter slope. <br />As the topsoil in the stockpile and existing plant site azea is minimal, reclamation will consist of scarifying <br />the azea with a plow or disc, drilling the seed and then using a straw mulch crimped in place at a minimum <br />rate of 2 tons per acre. Seeding and fertilizer application rates will be determined as per NRCS attached <br />recommendations. <br />There will be no ponds or buildings remaining on-site as result of this operation. <br />~~'~ ~ : ` ~)~ {~(~c <br />l 1 V I ~L. ~i Z`1U'J <br />pivision of Reclamation, <br />W~~mnB s~~G SaietY <br />