Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />Agency or organization name :OMG <br />Taskp: 009 State: Cobmdo PermiKpb a:M-1992-016 <br />Date: 03/05/2003 County: Femont Abbreviation:none <br />User- JD1 Sile: Penrose Ranch Filename: M016-009 <br />Permit or other job action :Phased Reclamation - t00 Acres <br />Task description :Mob/demob equipment /rom Canon City <br />EQUIPMENT TRANSPORT RIG COST Shifi basis: )per dey <br />Cost data source: CRG Data <br />Truck tractor tlescrpfrorr : Generk on-highway buck traGpq 6x2 diesel powered, d00 HP <br />Truck trailer Description :Generic loldinq gooseneck, drop deck equipment trailer (25T, SOT, and f00T) <br />Available rig capacities: 0-25 Tons 2650 T0p$ <br />Cost Breaktlown: Ownership cosVnour- 524.34 52699 <br />Operating cosMcun 52649 530.9 <br />Operator cosNwuo 6D.6% $ZZ 01 <br />Nelper cosMour: $000 523. ]B <br />Total Unit CosMour: 8]9.90 5108.1) <br />NON-ROADABLE EQUIPMENT <br />Machine WeighVunit Ownership Maul Nig Fleet Size Haul Trip I <br />Description (Tons) CosVhr/unit CosVhr/unit (NO. units) CasMrflleet 51+TOns <br />$33.09 <br />534.34 <br />SD.6) <br />523 >8 <br />St ]82B <br /> <br />Return Trip DOT permit <br />GosMrglaet CosVlleet <br />-Cat O6fl LGP-6S 2839 SZB.96 610811 1 $131.0] Si03.1/ 5000 <br />-Cat 623G x0.92 84831 5108.11 1 315642 $10811 5000 <br />-Beetling Fquipmem 10.00 520.00 8]9.90 I 599.90 5]9.90 50.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: 5393.38 5296.12 80,00 <br />ROAOABLE EQUIPMENT <br />Machine Total <br />Description CosVhour/unit Fleet Siie <br />Wo. units) Haul Trip <br />CasMdfleet Return Trip <br />CosVhrllleet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 6uMelels: 50.00 50.00 <br />EQUIPMENT MAUL DISTANCE antl TIME <br /> Nearest maj or city or town within proles area region : Canon City <br />T Iwdal CV 18 T'ma' Non- Total one-way travel tlistance: 150 miles <br /> Roadable Roatlable Average travel speed: 500 mph <br /> Equipment Equipment <br />Haul time (MUrs)= 030 0.30 Total non-roatlaDle moD/tlemob cost -: 52.>]4.03 <br />Return time (hours)= 030 030 'Iwo rauM trips wnn haw rig <br />Loatling time (hours)= 150 NA Total roadable moWtlemob cost": 30.00 <br />Unloatling time (hours)= 1.50 NA one rauM lrq, mluulrg <br />Subtotals= 3.60 0.60 <br />JOB TIME AND COST Total lob time: 7.20 hours <br /> total job cast $1,774 <br />