Laserfiche WebLink
D. No ponds, streams, or buildings will remain after reclamation. <br />E. During both mining and reclamation the prevailing hydrologic balance of the <br />affected land and the surrounding azea will not be adversely affected. <br />F. The estimated reclamation costs are limited to shaping the site, placing topsoil <br />and re-vegetation (see EXHIBIT L -reclamation costs). <br />