My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-02-16_REVISION - M2005045
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005045
>
2007-02-16_REVISION - M2005045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:53:44 PM
Creation date
11/21/2007 7:57:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005045
IBM Index Class Name
Revision
Doc Date
2/16/2007
Doc Name
Access Road Design
From
Gravel, LLC
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PN: 50663GE <br />November 20, 2006 <br />Retaining or <br />foundation wall <br />Water proof <br />membrane or <br />similar placed on <br />the foundation wall <br />and extending <br />below outer face of <br />Pervious drain board <br />fabric (optional) <br />Footing <br />Subsurface Drain System Concept <br />Impervious backfill for <br />upper 2 feet <br />Compacted backfill that <br />meets lateral earth pressure <br />design criteria. <br />Perforated pipe surcounded by <br />fabric wrapped free-draining <br />material. Note: The elevation <br />of the pipe will depend on the <br />location in the system at which <br />the cross section is considered. <br />No Scale <br />There aze often aspects of each site and structure which require some tailoring of the subsurface <br />drain system to meet the needs of individual projects. We are available to provide consultation <br />for the subsurface drain system for this project, if desired. <br />8.0 CONSTRUCTION CONSIDERATIONS <br />The section of the report provides comments, considerations and recommendations for aspects <br />of the site construction which may influence, or be influenced by the geotechnical engineering <br />considerations discussed above. The information presented below is not intended to discuss all <br />aspects of the site construction conditions and considerations that maybe encountered as the <br />project progresses. If any questions arise as a result of our recommendations presented above, or <br />if unexpected subsurface conditions aze encountered during construction we should be contacted <br />immediately. <br />is TRAUTNER ~ <br />A DIVISION OF TRIGONH31d <br />
The URL can be used to link to this page
Your browser does not support the video tag.