Laserfiche WebLink
<br />JIB <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department o(Nalural Resources <br />1317 Sherman 51., Room 215 <br />Denver, Colorado 80203 <br />Phone: (307) 866-3567 <br />fAX: (3031 832-8106 <br />June 30, 1995 <br />Ms. Sally Hayes <br />Battle Mountain <br />P.O. BoX 310 <br />Resources, Inc. <br />San Luis, CO 81152-0310 <br />~~ '~~ <br />RE: San Luis Project, Permit No. M-88-112 <br />Dear Ms. Hayes: <br />~"'~'' <br />DEPARTMENT OP <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames S. Lochhead <br />Executive Director <br />Michael B. long <br />Division Director <br />As you remember you and Anne Baldrige met with the Division on May 11, 1995. <br />Anne presented a list of issues that were unresolved up through they meeting <br />date. I would like to define the current status of each issue following the same <br />format as the list. <br />I. Outstanding Technical Revisions <br />A. TR-15 <br />B. TR-17 <br />C. TR-18 <br />D. TR-22 <br />The Division is still waiting for BMRI to respond to the adequacy <br />concerns of each T.R. <br />II. Outstanding Issues from 1992 NOV <br />A. Schedule <br />B. Reclamation <br />After a review of most of the permit file, and in discus4ing the <br />situation with other DMG employees; it was determined that an <br />abatement schedule for the 1992 NOV was never developed so, <br />therefore, any abatement time frame will be governed by each <br />individual technical revision and not by a master schedule. <br />I have not been able to review the reclamation evaluation <br />requirement of the 1992 NOV. I hope to have something to BMRI in <br />the near future. <br />