Laserfiche WebLink
ROADABLE EOUIPMENT sheet 2 of 2 <br />Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul time (hours) _ <br />Retum time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />0.29 0.29 Total non-roadable mob/demob cost' <br />0.29 0.29 ' twa round nips with haul rig <br />0.50 NA Total roadable mob/demob cost •' <br />0.50 NA •• one mood trip, no haul rig <br />1.57 0.57 <br />Boulder <br />10.0 miles <br />35.0 mph <br />$1.415.74 <br />$45.64 <br />_.__ <br />JOB TIME AND COST Total job time ; 3.14 hours <br />Total iob cost : 51.461 <br />EQUIPMENT HAUL DISTANCE and TIME <br />