Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task #: 003 <br />Date : 09/22r7006 <br />User: ESC <br />State :Colorado <br />County :Boulder <br />Site :Phil Sheddan Lode <br />PermiUjob# : M-1988-081 <br />Abbreviation :none <br />Filename : M081-003 <br />Agency or organization name :DRMS <br />Permit or other job action :Reevaluate amount of required bond <br />Task description : BackRl/ site to achieve 3h:1 v <br />Basic machine :Cat D8R Sedes Il - 8SU (200; Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank dpper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $58.24 NA <br />Operating cosUhour : $73.75 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />TotalumtcosUhour : $164.77 Totalfleetcost/hour: x184.77 <br />MATERIAL QUANTITIES <br />Initial Swell <br />Loose <br />volume : 750 LCY factor : NA volume : 750 LCY <br />Source of estimated volume :DRMS Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 150 feet <br />Unadjusted howdy producton : 634.3 LCY/hr <br />Material consistency description <br />Compacted 8/l or embankment <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight descdption <br />Decomposed rock - 50% Rock, <br />0.00 % (pos) <br />8,000 feet <br />2,900 Ibs/LCY <br />50% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.731 /LCY <br />wnunwn wrrecnon ractors Source <br />Operator skill : 0.75 (avg.) <br />Matedal consistency : 0.90 (Cat HB, <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (lshifUdai <br />Spoil pile : 0.80 ((nd-rn <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.36 <br /> <br />Adjusted unit production : 22539 LCYlhr <br />Adjusted Beet production : <br />_._ ..._ 225.39 LCY/hr <br />Total job time : 3.33 Hours <br />Total job cost : x548 <br />