My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-25_REVISION - M1988081 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988081
>
2006-09-25_REVISION - M1988081 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:44 AM
Creation date
11/21/2007 7:54:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988081
IBM Index Class Name
Revision
Doc Date
9/25/2006
Doc Name
FW Increase
From
DRMS
To
Comstock Mining & Refining
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION <br />Date : 25-Sep-2008 <br />User: ESC <br />Permit or job no.: 110-1988-081 Site :Phil Sheridan Lode <br />Abbreviation : none State :Colorado <br />Filename: M081-000 County:Bou/der <br />Agency or organization name :ORMS <br />Permit or job action :Reevaluate Amount of Required Bond <br />TASK LIST (DIRECT COSTS( FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Secure Shag Closure mineseal 1 4.0 $500 <br />002 -Remove Mine Structures mineseal 1 40.0 $1,633 <br />003 -8ackf~ll Sife to Achieve 3h:1 v dozer 1 3.3 $548 <br />004 -Revegetate Affected Land revege 1 8.0 $2,904 <br />005 -Mobilization/Demobilization mobilize 1 3.1 $1,461 <br />sueroTALS: 58.4 <br />• inUUdes 1nBatlan factor adiustment of : NA % TOTAL DIRECT COST' <br />OVERHEAD AND PROFIT- Liablliry In3UfanCB : 2.02 % O(direCt total = $142 <br />Performance bond : 1.05 % of direct total = $74 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = $705 <br />• not /squired (or eqp. operafw senrea as super) TOTAL O & P = $921 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direU+08 P)= $7,967 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % o/cntr. NA total = $398 <br />CONTINGENCY • NA+ NA total = NA <br />• contingencies accounted rer at task level TOTAL INDIRECT COST = $1,319 <br />TOTAL BOND AMOUNT (direct + Indirect) = 58,365 <br />
The URL can be used to link to this page
Your browser does not support the video tag.