My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-03-30_REVISION - M1977378 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1993-03-30_REVISION - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2021 8:04:28 AM
Creation date
11/21/2007 7:43:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Revision
Doc Date
3/30/1993
Doc Name
Evaluation of Hydraulic and Hydrochemical Aspects of Proposed Bulkheads
From
Sunnyside Gold Corp.
To
DMG
Type & Sequence
TR14
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF COIVTE/VTS <br />SECT/ON <br />PAGE <br />1.0 EXECUTIVE SUMMARY ................ . ............... 1 <br />2.0 INTRODUCTION ..................................... 5 <br />2.1 Location and Brief Description of the Sunnyside Mine ....... 5 <br />2.2 Statement of the Problem .......................... 5 <br />2.3 Reports Prepared to Evaluate Impacts of Proposed Bulkheads <br />at the Sunnyside Mine ............................. 8 <br />2.4 Purpose and Scope ............................... 9 <br />3.0 GENERAL HYDROGEOLOGY OF THE SUNNYSIDE MINE ......... 10 <br />3.1 Geology Pertinent to Ground-Water Flow and Chemistry .... 10 <br />3.2 Bedrock Permeability ............................. 14 <br />3.3 Pre-Mining Potentiometric Surface ................... 18 <br />3.4 Pre-Mining Direction of Ground-Water Flow ............. 19 <br />4.0 HYDROLOGY AFTER PROPOSED BULKHEADS ARE INSTALLED ... 22 <br />5.0 ESTIMATION OF HYDRAULIC HEAD AND HYDRAULIC CONDUCTIVITY <br />FROM FLOW TESTS ................................. 27 <br />5.1 Description of the Drill Holes Used for Flow Testing ....... 27 <br />5.2 Flow Test Methodology ........................... 28 <br />5.3 Measurement of Hydraulic Head ..................... 29 <br />5.4 Estimate of Hydraulic Conductivity .................. . 31 <br />6.0 RATE OF FLOODING OF MINE WORKINGS .................. 34 <br />6.1 Estimate Using Volume of Workings and Constant Flow ..... 34 <br />6.2 Estimate Using aGround-Water Flow Model ............. 36 <br />7.0 RATE OF LEAKAGE AROUND BULKHEADS .................. 40 <br />7.1 Equilibrium Water Level Behind the Bulkheads ............ 40 <br />7.2 Permeability at Proposed Bulkhead Sites ............... 41 <br />7.3 Leakage in the Immediate Vicinity of the Bulkheads ........ 43 <br />8.0 MOVEMENT OF WATER FROM FLOODED WORKINGS <br />TO THE SURFACE ................................... 48 <br />8.1 Nature of the Discharge from Flooded Mine Workings ...... 48 <br />8.2 Estimated Rate of Flow through Flooded Mine Workings .... 51 <br />8.3 Transit Time for Flow from Mine Workings to the Surface ... 55 <br />s unn y1 wpltraci122511Mar 1993. Rpt <br />Hsi SI~ilOtl HYDRO-SERRCH <br />
The URL can be used to link to this page
Your browser does not support the video tag.