Laserfiche WebLink
TABLE OF COIVTE/VTS <br />SECT/ON <br />PAGE <br />1.0 EXECUTIVE SUMMARY ................ . ............... 1 <br />2.0 INTRODUCTION ..................................... 5 <br />2.1 Location and Brief Description of the Sunnyside Mine ....... 5 <br />2.2 Statement of the Problem .......................... 5 <br />2.3 Reports Prepared to Evaluate Impacts of Proposed Bulkheads <br />at the Sunnyside Mine ............................. 8 <br />2.4 Purpose and Scope ............................... 9 <br />3.0 GENERAL HYDROGEOLOGY OF THE SUNNYSIDE MINE ......... 10 <br />3.1 Geology Pertinent to Ground-Water Flow and Chemistry .... 10 <br />3.2 Bedrock Permeability ............................. 14 <br />3.3 Pre-Mining Potentiometric Surface ................... 18 <br />3.4 Pre-Mining Direction of Ground-Water Flow ............. 19 <br />4.0 HYDROLOGY AFTER PROPOSED BULKHEADS ARE INSTALLED ... 22 <br />5.0 ESTIMATION OF HYDRAULIC HEAD AND HYDRAULIC CONDUCTIVITY <br />FROM FLOW TESTS ................................. 27 <br />5.1 Description of the Drill Holes Used for Flow Testing ....... 27 <br />5.2 Flow Test Methodology ........................... 28 <br />5.3 Measurement of Hydraulic Head ..................... 29 <br />5.4 Estimate of Hydraulic Conductivity .................. . 31 <br />6.0 RATE OF FLOODING OF MINE WORKINGS .................. 34 <br />6.1 Estimate Using Volume of Workings and Constant Flow ..... 34 <br />6.2 Estimate Using aGround-Water Flow Model ............. 36 <br />7.0 RATE OF LEAKAGE AROUND BULKHEADS .................. 40 <br />7.1 Equilibrium Water Level Behind the Bulkheads ............ 40 <br />7.2 Permeability at Proposed Bulkhead Sites ............... 41 <br />7.3 Leakage in the Immediate Vicinity of the Bulkheads ........ 43 <br />8.0 MOVEMENT OF WATER FROM FLOODED WORKINGS <br />TO THE SURFACE ................................... 48 <br />8.1 Nature of the Discharge from Flooded Mine Workings ...... 48 <br />8.2 Estimated Rate of Flow through Flooded Mine Workings .... 51 <br />8.3 Transit Time for Flow from Mine Workings to the Surface ... 55 <br />s unn y1 wpltraci122511Mar 1993. Rpt <br />Hsi SI~ilOtl HYDRO-SERRCH <br />