My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-03-30_REVISION - M1977378 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1993-03-30_REVISION - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2021 8:04:28 AM
Creation date
11/21/2007 7:43:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Revision
Doc Date
3/30/1993
Doc Name
Evaluation of Hydraulic and Hydrochemical Aspects of Proposed Bulkheads
From
Sunnyside Gold Corp.
To
DMG
Type & Sequence
TR14
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.4 Purpose and Scope <br />The purpose of this report is to assess the hydrogeologic and hydrochemical aspects <br />of the proposed underground bulkheads. Specifically this report addresses: <br />the likely rate of leakage in the immediate vicinity of the bulkheads; <br />the anticipated equilibrium water level in the flooded mine workings; <br />the approximate rate at which the mine workings will fill with water; <br />the nature, rate, and timing of movement of water from flooded workings to <br />the surface along natural and man-made pathways; <br />the likely chemistry of water which would be impounded; <br />the expected reactions between impounded water and country rock and <br />mineralized veins; and <br />the effects of the proposed bulkheads on the chemistry of local surface water. <br />This report builds upon an understanding gained during preparation of the earlier <br />report, "Preliminary Characterization of the Hydrology and Water Chemistry of the <br />Sunnyside Mine and Vicinity, San Juan County, Colorado" (Simon Hydro-Search, <br />1992). Additional work conducted in support of this report included: <br />Field examinations of proposed bulkhead sites in the American Tunnel, Terry <br />Tunnel, F-Level Brenneman vein, and B-Level Brenneman vein; <br />Conducting flow tests from boreholes in the American Tunnel in order to <br />estimate the hydraulic conductivity of the fractured volcanic rocks; <br />Laboratory measurement of permeability of rock cores taken from proposed <br />bulkhead locations; <br />Detailed calculation of the volume of mine workings (in vertical increments of <br />100 feet) for use in estimating flooding rates; <br />Simple numerical modeling of the rate of mine flooding; <br />A detailed analysis of the data to estimate hydraulic aspects of the proposed <br />bulkheads; <br />Petrographic analysis of wall rock from the vicinity of proposed bulkheads; <br />Coliection of secondary mineralization (wall encrustations) and subsequent <br />testing for acid-generating capacity; <br />Geochemical modeling of water/rock interactions using the MINTEQA2 code; <br />and <br />A detailed analysis of water chemistry and mineralogic data to estimate the <br />hydrochemical impacts of the proposed bulkheads. <br />aunnylwpltreci\22911Mar1993.gpt 9 <br />NCI S{(11011 HYDRO-SERRCH <br />
The URL can be used to link to this page
Your browser does not support the video tag.