My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-10-11_REVISION - M1977098
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977098
>
2007-10-11_REVISION - M1977098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:45:30 AM
Creation date
11/21/2007 7:43:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977098
IBM Index Class Name
Revision
Doc Date
10/11/2007
Doc Name
Notice of surety increase
From
DRMS
To
Lafarge Western U.S. Region
Type & Sequence
SI3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 04a <br />Date : 10/10/2007 <br />User : THM <br />State :Colorado <br />County :Garfield <br />Site :Sievers Pit <br />PermiUjob # :M-1977-098 <br />Abbreviation :none <br />Filename : M098-04a <br />Agency or organization name :DRMS <br />Permit or other job action :Final Reclamation Bond Costs <br />Task description :Rip Stage A and B for top: <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Basic machine :Cal D8R Series !I - 8SU (200: Horsepower : 3>0 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA <br />Area : 72.35 acres Rip depth (ft) : 2.00 <br />Bank volume : NA BCY <br />Volume : 233,449 BCY or CCY <br />Source of estimated quantity :area within Stages A and 8 <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feet/second <br />Unadjusted production : NA cu. yds./hour <br />Unadjusted production <br />per selected method : 2,494.65 cu. yds./hour <br />Area : Avg. ripping depth : 2.00 feeUpass Site altitude : 6,000 feet <br />Average ripping width : 7.08 feeUpass Altitude adjustment : 1.00 (Cat HB) _ <br />Average ripping length : 200.00 feet/pass Job efficiency factor : 0.83 (1 shiR/day) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 mutdptier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.773 acres/hour Adjusted unit production : 2,070.56 cu. yds./hour <br />Unadjusted production : 2,494.65 cu. yds./hour Adjusted fleet production : 4,141.13 cu. yds.lhour <br /> <br />JOB TIME AND COST <br />Fleet size : 2 dozers) Total job time : 56.37 hours <br />Unit cost : $0.068 per cu. yd. Total job cost : $15,868 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.