Laserfiche WebLink
~~, <br />~A~ Q1 <br />5 STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Rewurces <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />PFtorte: (3031 86(x3567 <br />FA%: (303I 832A[06 <br />June 22, 2006 <br />Ms. Jodi Villa, P.E. <br />Project Manager <br />143 Union Boulevazd <br />Suite 600 <br />Lakewood, CO 80228 <br />RE: Siegrist Construction Com <br />Permit No. M-1982-015; <br />Extension ' <br />Deaz Ms. Villa, <br />The Division has received the aI <br />(May 23, 2006). Based on the Di <br />that the proposed changes to the <br />enough to constitute an amendn <br />Mazch 29, 2006. The Division c. <br />of the St. Vrain River to be a sub <br />application. <br />As a result of the meeting held on June 22, 2006 (list of attendees enclosed), the Division has <br />agreed to afford the applicant the opportunity to clarify the adequacy review responses received by <br />the Division on June 12, 20061 The clarifications may or may not change the Division's <br />determination. <br />Specifically, information re <br />required cross-sectional dia; <br />detailing the location(s) that <br />assumptions. <br />Upon receipt of information that <br />its preliminary review of the sub <br />review will serve to determine <br />reclamation plan. As stated in <br />changes in the Reclamation Play <br />Permit Amendment. <br />In the interim, the Division will <br />us on June 12, 2006. Additional <br />Amendment to Current Amendment 112 Application, <br />ification Information Requirements and Decision Date <br />mt's response (June 12, 2006) to our initial adequacy review <br />In's review of the materials submitted, it is our determination <br />finally proposed reclamation plan are, at this time, significant <br />to the application originally submitted for consideration on <br />lers the proposed installation of riprap along the entire reach <br />al enough change to constitute an amendment to the original <br />includes: proposed stream bank protection specifications, <br />of the proposed stream bank protection components, map <br />bank protection will occur, and hydrologic and engineering <br />efinitively addresses these concerns the Division will complete <br />fission within 5 working days of receipt per Rule 1.8.1(6). This <br />le degree of significance the proposed changes pose to the <br />ule 1.8.1(5), the Division will decide whether the proposed <br />are simply a clarification or require a Technical Revision or <br />its second adequacy review of the response submitted to <br />review concerns from this review aze forthcoming. <br />COLORADO <br />DIVISION O F <br />MINERALS <br />GEOLOGY <br />SAFETT•SCIENCE <br />sm owem <br />Governor <br />Ru:sen Geor®E <br />Executive Dlector <br />Ronald W. Cattarly <br />Division Director <br />Natural Resounx Tnntce <br />Office of <br />Mined Land Reclamation <br />Office of <br />Active and Inactive Mines <br />Colorado <br />Geological Survey <br />