My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-03-24_REVISION - M1980244 (68)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2000-03-24_REVISION - M1980244 (68)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:57:10 AM
Creation date
11/21/2007 7:42:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
3/24/2000
Doc Name
PHASE IV EXTERNAL POND PLAN AND DETAILS
Type & Sequence
AM8
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />t <br />C <br />c <br />c <br />t <br />L <br />t <br />t <br />t <br />C <br />C <br />t <br />t <br />1% <br />SURFACE <br />DIVERSION <br />I J <br />o 0 <br />O <br />fq v <br />NEL <br />PHASE IV EXTER[' AL P014D PLAN VIED/ <br />TOP 80 MIL GEONET <br />SMOOTH HDPE BETWEEN TOP <br />AND BOTTOM <br />GEOMEMBRANE <br />GEOMEMBRANES <br />BOTTOM 80 MIL <br />SMOOTH LLDPE 1' MIN. SOIL <br />GEOMEMBRANE LINER FILL <br />POND SUBGRADE <br />EXTERNAL POND <br />GEOMEMBRANE RAKE LINER DETAIL <br />24 / NOT TO SCALE <br />9800 <br />9775 <br />o 9750 <br />a <br />9725 <br />9700 <br />9675 <br />0.0 <br />100.0 200.0 300.0 400.0 <br />rW POND SECTION A -A' <br />24 SCALE: 1"=50' <br />9800 --- .__. <br />- - -' - - ----------- <br />9775_ ___- -_ <br />EL. 9 36.0 <br />Z 9750 ! <br />1 EL 703.0 <br />w 9725 <br />2.5 <br />9700 - - - — -- <br />GE -0 EM6RANE 2 <br />,OR TRENCH 24 <br />9675 - -- - -I - - -I -- - <br />0.0 100.0 200.0 <br />1 <br />TOP 80 MIL 24 2' MIN.-P-] GRADE TO DRAIN <br />SMOOTH HDPE 1% MIN. <br />GEOMEMBRANE <br />BOTTOM 80 MIL <br />SMOOTH LLDPE <br />GEOMEMBRANE- <br />GEONET BETWEEN <br />TOP AND BOTTOM <br />GEOMEMBRANE <br />3' MIN. SOIL LINER FILL OR <br />OTHER FILL APPROVED <br />1' MIN. BY THE MANAGER TO <br />SOIL LINER BACKFILL ANCHOR <br />TRENCH <br />1__w2' MIN. <br />TYPICAL EXTERNAL P014D ANCHOR DETAIL <br />NOT TO SCALE <br />Bf <br />_V- � 9800 <br />I <br />AROUND -____- EL 9 36 0 <br />-- _ 1 775 <br />L 20' <br />9703.0 - i 1 - 9 <br />-- - - -� - -- - - -t _ - -- � 9750 c <br />, <br />I <br />e <br />- -- <br />fi IGEOMEMBR�NE 2 9725 <br />2.5 SYSTEM AN�HOR <br />9700 - - -- <br />I <br />9675 <br />300.0 400.0 500.0 600.0 <br />I3 P014D SECTION B43' <br />24. SCALE: 1"=50' <br />L-ECEN 0 <br />EXISTING GROUND SURFACE ELEVATIONS <br />=rt=11=11c PROPOSED LIMITS OF PHASE IV LINER <br />FINAL GROUND SURFACE ELEVATION <br />(TOP OF UPPER GEOMEMBRANE IN POND <br />AREAS) <br />1.5H:1 V -oo SLOPE INDICATOR, EXPRESSED AS <br />HORIZONTAL TO VERTICAL <br />[COTES: <br />1. ELEVATION SHOWN TO TOP OF UPPER GEOMEMBRANE <br />LINER. <br />2. POND PROVIDES TOTAL CAPACITY OF 10 MILLION GALLONS <br />TO EL. 9,733 CREST ELEVATION OF 9,736 INCLUDES <br />3 FEET OF FREEBOARD. <br />3. ROAD WIDTH MAY BE MODIFIED DURING CONSTRUCTION AS <br />APPROVED BY CC &V. <br />4. TOPOGRAPHY PROVIDED BY WESTERN STATES SURVEYING INC. <br />BASE ON TOP OF SOIL LINER FILL AS -BUILT SURVEY FOR <br />PHASE I, II, & 1999 PHASE III. ALL OTHER AREAS WERE <br />BASED ON FEBRUARY 1998 AND DECEMBER 1999 GROUND <br />SURVEYS AND THE 1998 AERIAL SURVEY. 2000 PHASE III <br />AND PROPOSED PHASE IV REGRADING PLAN IS DEVELOPED BY <br />GOLDER ASSOCIATES INC. <br />5. REFER TO PHASE I, II, AND III EXTERNAL POND DESIGN FOR <br />LEAK DETECTION SYSTEM, SOLUTION RECOVERY SYSTEM, AND <br />LOW VOLUME SOLUTION RECOVERY SYSTEM. <br />IIIEIIIIIE !EIEPiliiillllliliiiliii <br />19527 <br />Permit # M- 1980 -244 <br />Amendement No. 8 March 24, 2000 <br />Al <br />- <br />9800 <br />,`9775 <br />9750 o <br />__ <br />1 9725 w <br />-- <br />9700 <br />--19675 <br />I <br />500.0 <br />Bf <br />_V- � 9800 <br />I <br />AROUND -____- EL 9 36 0 <br />-- _ 1 775 <br />L 20' <br />9703.0 - i 1 - 9 <br />-- - - -� - -- - - -t _ - -- � 9750 c <br />, <br />I <br />e <br />- -- <br />fi IGEOMEMBR�NE 2 9725 <br />2.5 SYSTEM AN�HOR <br />9700 - - -- <br />I <br />9675 <br />300.0 400.0 500.0 600.0 <br />I3 P014D SECTION B43' <br />24. SCALE: 1"=50' <br />L-ECEN 0 <br />EXISTING GROUND SURFACE ELEVATIONS <br />=rt=11=11c PROPOSED LIMITS OF PHASE IV LINER <br />FINAL GROUND SURFACE ELEVATION <br />(TOP OF UPPER GEOMEMBRANE IN POND <br />AREAS) <br />1.5H:1 V -oo SLOPE INDICATOR, EXPRESSED AS <br />HORIZONTAL TO VERTICAL <br />[COTES: <br />1. ELEVATION SHOWN TO TOP OF UPPER GEOMEMBRANE <br />LINER. <br />2. POND PROVIDES TOTAL CAPACITY OF 10 MILLION GALLONS <br />TO EL. 9,733 CREST ELEVATION OF 9,736 INCLUDES <br />3 FEET OF FREEBOARD. <br />3. ROAD WIDTH MAY BE MODIFIED DURING CONSTRUCTION AS <br />APPROVED BY CC &V. <br />4. TOPOGRAPHY PROVIDED BY WESTERN STATES SURVEYING INC. <br />BASE ON TOP OF SOIL LINER FILL AS -BUILT SURVEY FOR <br />PHASE I, II, & 1999 PHASE III. ALL OTHER AREAS WERE <br />BASED ON FEBRUARY 1998 AND DECEMBER 1999 GROUND <br />SURVEYS AND THE 1998 AERIAL SURVEY. 2000 PHASE III <br />AND PROPOSED PHASE IV REGRADING PLAN IS DEVELOPED BY <br />GOLDER ASSOCIATES INC. <br />5. REFER TO PHASE I, II, AND III EXTERNAL POND DESIGN FOR <br />LEAK DETECTION SYSTEM, SOLUTION RECOVERY SYSTEM, AND <br />LOW VOLUME SOLUTION RECOVERY SYSTEM. <br />IIIEIIIIIE !EIEPiliiillllliliiiliii <br />19527 <br />Permit # M- 1980 -244 <br />Amendement No. 8 March 24, 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.