Laserfiche WebLink
RECLAMATION COST SUMIARY cont'd sheet 3 of 4 <br /> N. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br /> Task No.1 Task Description I Cost IS) <br /> ____ _---------- <br /> --- I <br /> I I <br /> I I <br /> Subtotal (H): <br /> 1. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br /> Task Nod Task Description I Cost (S) <br /> _____—-------._I_____-__ <br /> I I <br /> I I <br /> i I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> subtotal (1):— ------ <br /> ------------ <br /> J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br /> Task Nod Task Description I Cost (S) <br /> I_______-_____-__-_----------_-__ __- <br /> 2 1 Topsoil 53 acres I $31,923 <br /> 4 1 Place overburden on stockpiles I $4,954 <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I 1 <br /> I I <br /> Subtotal (J): $36,877 <br />