My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-10-15_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
1985-10-15_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 4:59:27 PM
Creation date
11/21/2007 7:39:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
10/15/1985
Doc Name
Internal MEMO - POND 006 AND 007 ADEQUACY
From
MLRD
To
JEFF DECKLER
Type & Sequence
TR4
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aichard D. Lamm <br />Governor <br />• <br />• <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. Getches, Executive Director <br />MINED LAND RECLAMATION DI1 <br />DAVID C. SHELTON, Director <br />DATE: October 15, 1985 <br />T0: Jeff DeckTer <br />FROM: Candace Thompson <br />RE: New Elk - Pond 006 and 007 Adequacy <br />The adequacy comments submitted by Wyoming Fuel Company supply the needed <br />information to answer my hydrology issues over the revamping of the pond <br />structures at the New Elk facilities area. <br />Several minor issues remain which Wyoming Fuels needs to commit to prior to TR <br />approval to avoid stipulations to the TR. These are: <br />1. Submission of certification of Pond 007 within 30 days of TR <br />approval, detailing surveyed information including dimensions, outlet <br />structure sizing and elevations. <br />2. Submission of a method for determining sediment volume in Pond 007 <br />whereby a rough estimate of accumulation of sediment can be determined <br />by both mine and MLRD inspectors of the site. This method must be <br />implemented within 30 days of TR approval. <br />/ph <br />3. Submission of As-Built certification of Pond 006 within 30 days of <br />completion of pond alteration. <br />Doc. No. 4150 <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />III IIIIIIIIIIIIIIII <br />999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.