My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-04-07_REVISION - M1988112 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1992-04-07_REVISION - M1988112 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 4:03:56 PM
Creation date
11/21/2007 7:39:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
4/7/1992
Doc Name
SAN LUIS PROJECT REVISION APPROVAL PN M-88-112 RN TR-004
From
MLRD
To
BATTLE MOUNTAIN RESOURCES INC
Type & Sequence
TR4
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />(Z) Resolution of the tailings cyanide concentration level <br />representations contained in its original approved permit) and this <br />technical revision application. <br />(3> Documentation and elaboration of its statements that typilcal <br />tailings circuits contain 100 - 200 ppm free cyanide plus some WAD. <br />(4) Applicable cyanide concentration standards applied by other <br />regulatory jurisdictions. <br />BMG should submit this additional information no later than April 17, 1992. <br />Stipulation No. 2 <br />Pending approval by the Division of amended permissible cyanide congentration <br />levels for the tailings slurry, BMG shad continue "Cytox" treatment of the <br />tailings slurry within the tailings impoundment until the approved ~ermit <br />cyanide concentration limitations of 4.4 ppm for total cyanide and .S ppm for <br />weak acid dissociable cyanide are achieved, or until the Division orders <br />cessation. <br />Stipulation No. 3 <br />The proposed monitoring plan (Appendix V) shall be amended as folloHS: <br />Monitoring location 4 of the Technical Revision shall be amended to read <br />"4. At the outlet of the pipe delivering water from the tailings <br />underdrain system to the collection pond." <br />A Monitoring Location 5 shall be added "5. At all leak detecltion L..~' <br />monitoring points (leak detection points shall be sampled on a week) <br />frequency)." <br />B ~'/ <br />r <br />r ~ <br />P <br />''~ M <br />t c <br />r '~ <br />~ t <br />~ i~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.