Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 State :Colorado <br />Date : 03/05/2007 <br />User: DEG <br />County :EI Paso Abbrevia8on :none <br />Site :Solberg Pit Filename : M044-002 <br />Agency ar organization name : DRMS <br />Permit or other job action :Amendment to 112(c) <br />Task description :Apply 8 inches of topsoil across disturbed acreage <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Sedes 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $58.86 NA <br />Operating cosUhour : $73.75 100 <br />Ripper op.cosUhour : $4.25 50 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $169.64 Total Fleet cosfihour : x169.64 <br />::: :;:: .::.~: .. ..~r ~ <br />;: <br />MATERIAL t]UANTITIES z .<: <br />,. <br />Initial Swell Loose <br />volume : 15,000 CCY factor : 1.060 volume : 15,900 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 225 feet <br />Unadjusted hourty production : 432.4 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 2.00 <br />Average site altitude : 6,640 feet <br />Material weight : 2,400 Ibs/LCY <br />Weight description <br />Sand -Dry, loose <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Job Condition Correction Factors <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient: 1.05 <br />Altitude : 1.00 <br />Matedal weight : 0.96 <br />Blade type : 1.00 <br />Net correction : 0.50 <br />Source <br />Adjusted unit production : 215.84 LCY/hr <br />Adjusted fleet production : 215.84 LCY/hr <br />Total job time : 73.87 Hours <br />PermiUjob# : M-1981-044 <br />Unit cos! : $0.786 /LCY Tota! job cost : x12,497 <br />