Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Retum Trip <br />Description Cosf/hour/unit (No. units) CosUhr/fleet Cost/hr/fleet <br />-Water Tanker, 2,500Ga1. $47.55 1 $47.55 $47.55 <br />Subtotals : 547.55 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul lime (hours) _ <br />Retum time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />0.17 0.17 <br />0.17 0.17 <br />1.00 NA <br />1.00 NA <br />2.34 0.34 <br />Total non-roadable mob/demob cost' <br />• Mro round trips with haul rig <br />Total roadable mob/demob wst " <br />•• one round idp, no haul ng <br />JOB TIME AND COST <br />Total job 6me <br />Total job cost <br />