~nks and Gesso, LLC <br />FJCHIBIT D: Mining Plan <br />Overview <br />The Applicant proposes to develop the site for mining and processing of sand <br />and gravel. Approximately 32.5 acres of the total permit area of approximately <br />52 acres is proposed for mining (see Exhibit C-3, Mining Plan Map). After mining <br />is complete, the excavated area will be reclaimed as awater-storage reservoir <br />surrounded by an engineered, im ermeable bentonite slur wall that will be <br />constructed arior to mining operations below aroun water eve s. e e des o <br />establishing itself. <br />gradually <br />The post-mining land use of the property is for water storage and wildlife habitat. <br />Mining Methods -Rule 6.4.4(a) ,//~ <br />The Applicant proposes to dry-mine the property. Initial mining will occur in the '0 <br />northern portion of the property and progress southward. Initial mining <br />operations will include stripping of topsoil and construction of a tailings pond at <br />the southern end of the property. A slurry trench will be constructed around the <br />perimeter of the property prior to commencement of mining operations below ' <br />existing groundwater levels. The slurry wall will be located approximately at a 50 a <br />foot offset from the center line of Brighton Road on the east, and at an offset of /~ <br />approximately 35 feet from the property line in other areas. Depiction of the ~„q` <br />slurry wall on the plans herein is based on field locations and may change ~ ~ <br />according to field conditions. <br />In order to reduce the cost of slurry wall installation, the Applicant proposes to <br />excavate material across the site to an elevation of 5010 feet. This is <br />approximately 10 feet below the highest point on the property, but still <br />approximately 5 feet above existing groundwater levels. The top of cut for this aor ~ <br />excavation will be located approximately 40 feet from the center line of Brighton <br /> <br />Road on the east, and approximately 25 feet from the property line in other `~ <br />areas. Once an excavation elevation of 5010 feet is reached, slurry wall <br />construction will begin along the perimeter of the permit area. Upon completion <br />of slurry wall construction, the Applicant will backfill to original grade to a point <br />approximately 20 feet offset of the slurry wall. At this point mining will commence <br />~ <br />below groundwater at a near vertical slope, with reclaimed reservoir wall ' <br />backfilled to a minimum 3:1 slope. <br />Raw material will be excavated with front~end loaders, excavators, and tractors. <br />The material may be loaded on a field conveyor in the mining area and conveyed <br />back to the processing area, or some materials may be excavated with scrapers <br />or off-road haul trucks. Shale material may be pushed up with a bulldozer for <br />subsequent handling with the front-end loaders. Conditional upon a completed <br />Stapecoech Mine -Regular 112 derma 01045 <br />Mobile Rernh Concrete Ina 6 November, 2001 <br />