Laserfiche WebLink
PAGE <br /> 20 <br />8. Army Corps of Engineers states thaz a 404 Permit will be necessary if any <br /> wetlands arc disturbed. <br />IV, STAF F FINDINGS: <br />1. Under the conditions noted, the proposed use is consistent with the <br /> Comprehensive Zoning Resolution and the County Land Use Plan. <br />2. Under the conditions noted, the proposal is compatible with sutroundutg land <br /> uses, and will not impact properties or property values in the area. <br />3. Under the conditions noted, the proposal will not affect the public health, safety, <br /> welfaze, or prosperity. <br />V. PLAN NING CO Mr 4 ON >;rnwt~,tFwnATrnx (12-15-93): <br />Approval of the Special Review with the following conditions: <br />1. Approval is granted only for mining and reclamation of Phases 1, 2, a»d 3. Future <br /> requests to mine additional areas will take into consideration the success of the <br /> proposed reclamation plan. PHASE 3 WOULD BE PERMTI'EED ONLY ON <br /> SUCCESSFUL EVALUATION OF RECLAMATION OF PHASES ] & 2. <br />2. No more than 35 acres shall be disturbed az one time. Reclamation shall follow the <br /> mining activity in a sequential and timely manner. <br />3. Prior to requesting release of any performance bonds from the State Division of <br /> Minerals and Geology, the applicant shall provide a detailed report to the county <br /> regazding the status of the mining operation and reclamation efforts. <br />4. Revegetation shall be in conformance with the recommendations of the Soil <br /> Conservation Service. <br />5. The haul route for rocks shall be as indicated in the application, unless otherwise <br /> approved by the Lorimer County Engineering Department. <br />6. In all areas where reseeding is to occur, Holnam shall provide a layer of topsoil, in <br /> addition to the blasted overburden/manure mixture. Mulching shall also be <br /> accomplished in these area, in accordance with SCS recommendations. <br />7. Ponderosa pines shall be a ~-e€3'-tall MIXTURE OF 3' TALI. TREES & <br /> SEEDLINGS at the time of planting IN ~ FIRST PHASE AS A 25,75 <br /> MIXTURE. TT-IE PLANNING COMMISSION WILL CONDUCE AN <br /> EVALUATION OF THE SUCCESS OF THE TREE PLANTING 2 YEARS <br /> FROM THE INITIAL PLANTING. <br />8. Except as modified by the above conditions, all mining and reclamation shall be <br /> consistent with Zoning File Exhibit A (Application for Zoning Action dated May <br /> 14, ]993, document labeled "Adequacy Review", and plans for mining, and <br /> reclamation dated October 20 and 21, 1993). <br />LARIMER COUNTY BCC 1/10/'94 sus.tECT SLAB CANYON L]ME;~TONE <br />PLANNING STAFF REPORT QUARRY SPECIAL REVIEW <br /> <br />LCPZ-32 (7Dl86) <br />